| Page # | Generic | Room # | Comments | Lab occupant alert | |
| 0 | 0 | 0 | 0 | Cooling water pipies not shown | |
| 0 | 0 | 0 | 0 | Vac pump exhaust detail is not settled. | |
| 0 | 0 | 0 | 0 | There are no special temperature and humidity documented. The whole building appears to be controlled at +/- 1 F | |
| 0 | 0 | 0 | 0 | Occupant's should view cheap heat exchangers and decide where they are acceptable. | |
| A1.1 | 2 | Emergency generator should be relocated to area behind nitrogen storage | |||
| A2.1A | Demolition | 16 | 1000 | Not necessary to demolish paving | |
| A2.1A | Demolition | 9 | 1509 | Not necessary to demolish snorkel arm | |
| A2.1A | Demolition | 9 | 1517 | Not necessary to demolish snorkel arm | |
| A2.1R | 1509 | Why remove the snorkel exhasut arm? | |||
| A2.1R | 1517 | Why remove the snorkel exhasut arm? | |||
| A2.2 | 2410 | 2 each fume hoods removed and replaced with laminar bio cab for 2410 reno. Project | |||
| A2.3 | 3207 | Note door location | |||
| A2.3 | 3217 | Note sink location | |||
| A2.3 | 3217 | Note fume hood location | |||
| A2.3 | 3310 | Labeled as 3301 | |||
| A2.3 | 3310A | Labeled as 3301A | |||
| A2.6 | Demolition | 4 | 6324 | This will be done as part of Hansma renovation | |
| A3.1A | 1302 | 2 Two cylinder racks | |||
| A3.1A | 1302 | Need chemical/solvent storage | |||
| A3.1A | Renovation | 7 | 1517 | two cylinder racks | |
| A3.1E | L100 | Sound proof doors | |||
| A3.1E | L110 | Sound proof doors | |||
| A3.1E | L201 | Repair ladder | |||
| A3.1E | L201 | Sound proof doors | |||
| A3.2 | 2406 | Need waste storage cabinet | |||
| A3.2 | 2410 | Will be remodeled for Fygenson in Spring of 98 | |||
| A3.2 | 2416 | Will be remodeled for Fygenson in Spring of 98 | |||
| A3.2 | 2513 | Door added to 2517 | |||
| A3.2 | 2517 | Door added to 2513 | |||
| A3.2 | Renovation | 6 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 14 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 15 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 17 | See Fygenson remodel spring 98 | ||
| A3.3 | 3209 | Move fume hood to 3209A | |||
| A3.3 | 3217 | Hood location | |||
| A3.3 | 3217 | Door, Rich Harding | |||
| A3.3 | 3410 | Gas cylinder rack | |||
| A3.3 | 3209A | Note existing door | |||
| A3.3 | How do we upgrade the wall wrt to fire rating | ||||
| A3.4 | 4316 | Replace curtain with swinging door | |||
| A3.4 | 4318 | Fume hood needed | |||
| A3.4 | 4318 | Increase opening | |||
| A3.4 | 4324 | Increase opening | |||
| A3.4 | 4402 | New sink | |||
| A3.4 | 4402 | Gas cylinder rack | |||
| A3.4 | 4406 | New sink | |||
| A3.4 | 4410 | Gas cylinder rack | |||
| A3.4 | 4418 | +/- 1F | |||
| A3.4 | 4513 | Replace sink and case work with solvent storage | |||
| A3.4 | 4513 | 4 Gas cylinder racks | |||
| A3.4 | 4513 | Remove toic gas cabinet | |||
| A3.4 | 4513 | Door added | |||
| A3.4 | 4517 | Remove sink | |||
| A3.4 | 4517 | solvent storage | |||
| A3.5 | 5334 | Snorkel exhaust arm not required | |||
| A3.6 | Renovation | 13 | 6302 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6308 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6310 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6316 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6318 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6324 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6332 | April 98 remodel | |
| A3.7 | Renovation | Exhaust should re-examined See new location for emergency generator | |||
| A4.1 | Revisit intake noise issues | ||||
| A5.7 | Expand the pad as shown on plans to protect roof from astro students. | ||||
| A5.7 | Move emergency generator exhaust to clear space for astro students. | ||||
| A5.7 | Celestron mounting fixtures must remain on roof. | ||||
| A5.7 | Increase pad size to protect roof from Astro students | ||||
| A5.7 | Make sure exhaust stakes do not present a hazard to Astro students | ||||
| E0.01 | Demolition | 1 | No walls removed, not all existing to be removed. | ||
| E0.01 | Demolition | 1 | No walls are to be removed | ||
| E0.01 | Demolition | 1 | Not all existing to be removed | ||
| E0.01 | General | 5 | Physics department will specify conditions underwhich the contractor will work. | ||
| E0.01 | General | 5 | We need clearly specify "conditions" | ||
| E0.01 | General | 11 | We need to be supplied with a set of current "as built" drawings at the completion of the project | ||
| E0.01 | Demolition | 12 | Existing conductors in the labs will be reused. | ||
| E0.01 | Demolition | 12 | All new wiring is not necessary…. | ||
| E0.01 | General | 14 | No disruption of labs not being renovated. | ||
| E0.01 | General | 14 | Clarification required for HVAC work | ||
| E0.01 | General | 20 | Lab equipment that is hardwired needs to be identified by occupants to get it rehardwired. Likewise odd plugs and receptacles that need to be reproduced by contractor need to be called out. | X | |
| E0.01 | General | 20 | Lab equipment will be reconnected by occupant or contractor as occupant sees fit. | ||
| E0.01 | General | 23 | No flexible conduit in labs | ||
| E0.01 | General | 44 | Flush mounting is not required. With few exceptions surface mounting is acceptable. | ||
| E0.01 | General | 44 | Surface mount is acceptable | ||
| E0.01 | General | 47 | We did not agree on separate ground in lab raceway | ||
| E0.01 | General | 47 | Where are the grounds being installed? Early agreement was new grounds from breakers to main panel. No new grounds in lab. | ||
| E0.01 | General | 49 | Leave existing panel boards in labs. What do these specs dictate vis-à-vis demolition. | ||
| E0.01 | General | 49 | Leave existing power oanels | ||
| E0.01 | General | 50 | Replacing receptacles is not cost effective. Broken receptacles should be replaced as maintenance. | ||
| E0.01 | General | 51 | Do not replace all switches. | ||
| E0.01 | General | 53 | Grounding conductors in core but not from breaker panels to outlets in labs. | ||
| E0.01 | General | 53 | Except in labs | ||
| E0.01 | General | 54 | This is applicable to the core only. | ||
| E0.01 | General | 60 | Check electrical noise levels | ||
| E0.01 | General | 61 | Do not replace what is not required . Recent energy bond project | ||
| E0.01 | General | 49,50,51 | Do not replace unless broken or missing | ||
| E0.03 | Remodel | 4 | RELOCATE Emergency Generator | ||
| E0.1R | Communications | 0018 | Add cabletray from Main terminal room to North core small terminal room | ||
| E0.3R | Communications | Core | Add cabletray from Main terminal room to North core small terminal room | ||
| E1.1R | Communications | 1015 | Add 2 communication wallplates | ||
| E1.1R | Communications | 1017 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1019 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.1R | 1209 | Emer 208 3 phase 20 A in core with switch in Lab | |||
| E1.1R | 1209 | 208 3 phase emergency power in lab | |||
| E1.1R | 1302 | Emergency power 208 3phase 60A | |||
| E1.1R | 1302 | Emergency power 208 3phase 30A | |||
| E1.1R | 1302 | Emergency power in core | |||
| E1.1R | 1310 | Add 2 emergengy power as indicated and remove one as indicated | |||
| E1.1R | 1310 | Add one more 208 3 phase 20 A emergency in core | |||
| E1.1R | Communications | 1017A | Add 1 communication wallplate | ||
| E1.2R | Communications | 1020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E1.2R | 1219 | 1 208, 3 phase emergency power 20 A | |||
| E1.2R | 1219 | 3 110 Emergency power | |||
| E1.2R | Communications | 1219 | Add 1 communication wallplate | ||
| E1.2R | 1251 | 3 emergency power outlets 208, 3 phase, 30 A | |||
| E1.2R | 1251 | Outlets on far wall | |||
| E1.2R | 1251 | Door not shown | |||
| E1.2R | 1332 | 110 emergency power in lab | |||
| E1.2R | 1332 | 208 3 phase 20 A emergency in core switched in the lab | |||
| E1.2R | 1356 | 3 110 emergency power | |||
| E1.3R | Communications | 1301 | Add 2 communication wallplates | ||
| E1.3R | Communications | 1311 | Add 2 communication wallplates | ||
| E1.3R | Communications | 1409 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1411 | Add 1 communication wallplate | ||
| E1.3R | 1412 | 2 Communications ports | |||
| E1.3R | Communications | 1413 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1415 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1416 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1450 | Core: close cabletray loop at north end | ||
| E1.3R | Communications | 1450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.3R | 1509 | 120 volt emergency power | |||
| E1.3R | 1517 | 208 Emergency power | |||
| E1.4R | 1366 | Add two more emergency power | |||
| E1.4R | 1380 | Add two emergency power | |||
| E1.4R | 1390 | Add emergency power | |||
| E1.4R | 1362A | Add one more emergency power | |||
| E1.4R | Communications | 1362A | Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.5D | L100 | centralize all electrical panels | |||
| E1.5D | L100 | Repair/replace all bad lamp sockets | |||
| E1.5R | Communications | 1640 | Verify location of 1 communication wallplate | ||
| E1.5R | L100 | Data projector connectors | |||
| E1.5R | L100 | Suspend data projector from ceiling as well as required electrical and communications | |||
| E2.1R | Communications | 2020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.1R | Communications | 2020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E2.1R | 2217 | 110 emergency power in lab | |||
| E2.2R | Communications | 2020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E2.2R | 2217 | One more 110 emergency power | |||
| E2.2R | Communications | 2217 | Add 1 communication wallplate | ||
| E2.2R | 2223 | 110 emergency power in lab | |||
| E2.2R | 2225 | 110 emergency power in lab | |||
| E2.3R | 2402 | Emergency power in core | |||
| E2.3R | 2406 | Emergency power in core | |||
| E2.3R | Communications | 2410 | Move 1 wallplate location | ||
| E2.3R | Communications | 2416 | Move 3 wallplate locations | ||
| E2.3R | Communications | 2419 | Move 1 wallplate location | ||
| E2.3R | 2420 | Emergency power | |||
| E2.3R | 2420 | Emergency power in core | |||
| E2.3R | Communications | 2450 | Core: close cabletray loop at north end | ||
| E2.3R | Communications | 2450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.3R | Communications | 2450 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E2.3R | 2517 | 208 3phaase 20A emergency | |||
| E2.3R | 2517 | 110 V emergency power | |||
| E3.0D | 3310 | See comment about notation 3B should be 2?? | |||
| E3.0D | 3310A | Note breaker panel | |||
| E3.1R | Communications | 3000 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3001 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.1R | 3207 | Note door location | |||
| E3.1R | Communications | 3450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.1R | Communications | 3019A | Add 1 communication wallplate | ||
| E3.2R | Communications | 3020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E3.2R | 3340 | 2 Emergency power outlets | |||
| E3.2R | 3340 | 4 communications ports | |||
| E3.3R | 3409 | Add data port | |||
| E3.3R | 3413 | Add data port | |||
| E3.3R | 3416 | Add data port | |||
| E3.3R | Communications | 3416 | Add 4 120V emergency power duplex receptacles | ||
| E3.3R | Communications | 3450 | Core: close cabletray loop at north end | ||
| E3.3R | 3509 | 6 120V emergency power | |||
| E3.3R | 3509 | 3 220V emergency power | |||
| E3.3R | Communications | 3509 | Add 1 communication wallplate | ||
| E4.1R | Communications | 4020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E4.1R | Communications | 4020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E4.1R | Communications | 4103 | Add 2 communication wallplates | ||
| E4.1R | Communications | 4105 | Add 1 communication wallplate | ||
| E4.1R | Communications | 4111 | Add 1 communication wallplate | ||
| E4.1R | 4113 | 2 Data panels 1' above floor | |||
| E4.1R | Communications | 4113 | Add 1 communication wallplate | ||
| E4.1R | 4123 | Add data port | |||
| E4.1R | 4123 | 2 communications ports | |||
| E4.1R | 4123 | Data panel | |||
| E4.1R | Communications | 4123 | Add 1 communication wallplate | ||
| E4.1R | 4207 | Emergency power | |||
| E4.1R | Communications | 4450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E4.1R | Communications | 4450 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E4.2R | Communications | 4020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E4.2R | 4217 | 110 emergency | |||
| E4.2R | 4223 | 110 emergency | |||
| E4.2R | 4225 | 110 emergency | |||
| E4.2R | 4233 | 110 emergency | |||
| E4.2R | 4239 | 110 emergency | |||
| E4.2R | 4318 | 120 volt emergency power in core | |||
| E4.2R | 4318 | 120V emergency power | |||
| E4.2R | 4324 | 2 120V emergency power | |||
| E4.2R | 4326 | 2 120V emergency power | |||
| E4.2R | 4332 | 2 120V emergency power | |||
| E4.2R | Communications | 4332 | Add 1 communication wallplate | ||
| E4.2R | 4334 | 2 120V emergency power | |||
| E4.2R | 4340 | 2 120V emergency power | |||
| E4.3R | 4402 | emergency power in core | |||
| E4.3R | 4402 | Emergency power | |||
| E4.3R | 4406 | emergency power in core | |||
| E4.3R | 4406 | 2 emergency power outlets | |||
| E4.3R | 4409 | Emergency power | |||
| E4.3R | 4410 | Emergency power | |||
| E4.3R | 4410 | emergency power in core | |||
| E4.3R | 4411 | Emergency power | |||
| E4.3R | 4412 | Emergency power | |||
| E4.3R | 4415 | Emergency power | |||
| E4.3R | 4418 | 2 Emergency power outlets | |||
| E4.3R | 4418 | 2 pumps in core | |||
| E4.3R | 4418 | 2 Emergency power outlets in the core | |||
| E4.3R | 4419 | Emergency power | |||
| E4.3R | Communications | 4450 | Core: close cabletray loop at north end | ||
| E4.3R | 4509 | emergency power in core | |||
| E4.3R | 4513 | emergency power in core | |||
| E4.3R | 4517 | emergency power in core | |||
| E5.1R | Communications | 5020 | Move 5th floor main communications terminal from 5217 to Core | ||
| E5.1R | Communications | 5020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E5.1R | Communications | 5124 | Add 1 communication wallplate | ||
| E5.1R | Communications | 5131 | Add 1 communication wallplate | ||
| E5.2R | Communications | 5020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E5.2R | Communications | 5215 | Add 1 communication wallplate | ||
| E5.2R | Communications | 5217 | Replace 5th floor main communications terminal (now in core) w/subterminal | ||
| E5.2R | Communications | 5217 | Add 1 120V emergency power duplex receptacles | ||
| E5.2R | Communications | 5223 | Add 1 subterminal | ||
| E6.1R | Communications | 6020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E6.1R | Communications | 6105 | Move location of 1 communication wallplate | ||
| E6.1R | Communications | 6123 | Add 1 communication wallplate | ||
| E6.1R | Communications | 6204 | Add 1 communication wallplate | ||
| E6.2R | Communications | 6020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E6.2R | Communications | 6212 | Add 1 communication wallplate | ||
| E7.1R | Communications | Roof | Add 6 communication wallplates | ||
| E7.2R | Communications | Roof | Add 3 communication wallplates | ||
| M0.0D | Demolition | 18 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1D | 1219 | 2 Vac exhausts | |||
| M1.1D | 1356 | 2 Vac exhausts | |||
| M1.1D | Demolition | 6 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1R | 1207 | +/- 1/2F | |||
| M1.1R | 1209 | Heat exchanger in core | |||
| M1.1R | 1209 | +/- 1/2F | |||
| M1.1R | 1302 | Heat exchangers are not indicated for equipment. | |||
| M1.1R | 1310 | 2 Vac pump exhaust in lab and 2 in core | |||
| M1.1R | 1310 | Move heat exchangers into the core | |||
| M1.1R | Need cooling water | ||||
| M1.2D | 1380 | Cooling chiller CH-1, Pump P-1 removed?? | |||
| M1.2D | Demolition | 2 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.2D | Remove (E) AC-3 | ||||
| M1.2R | 1332 | Pump in core cooling water? | |||
| M1.2R | 1332 | Heat exchanger in core | |||
| M1.2R | 1332 | +/- 1/2 F | |||
| M1.2R | 1356 | Fume hood and chem and solvent storage | |||
| M1.2R | 1251A | Cooling water in here | |||
| M1.2R | 1251A | Air inlet but there is no air outlet??? | |||
| M1.3D | L100 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| M1.3D | L108 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| M1.3D | L110 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| M1.3D | Demolition | 8 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | Missing sheets | |
| M1.3D | Work in lecture halls must take place in summer time | Missing sheets |
| Page # | Generic | Room # | Comments | Lab occupant alert | |
| 0 | 0 | 0 | 0 | Cooling water pipies not shown | |
| 0 | 0 | 0 | 0 | Vac pump exhaust detail is not settled. | |
| 0 | 0 | 0 | 0 | There are no special temperature and humidity documented. The whole building appears to be controlled at +/- 1 F | |
| 0 | 0 | 0 | 0 | Occupant's should view cheap heat exchangers and decide where they are acceptable. | |
| A1.1 | 2 | Emergency generator should be relocated to area behind nitrogen storage | |||
| A2.1A | Demolition | 16 | 1000 | Not necessary to demolish paving | |
| A2.1A | Demolition | 9 | 1509 | Not necessary to demolish snorkel arm | |
| A2.1A | Demolition | 9 | 1517 | Not necessary to demolish snorkel arm | |
| A2.1R | 1509 | Why remove the snorkel exhasut arm? | |||
| A2.1R | 1517 | Why remove the snorkel exhasut arm? | |||
| A2.2 | 2410 | 2 each fume hoods removed and replaced with laminar bio cab for 2410 reno. Project | |||
| A2.3 | 3207 | Note door location | |||
| A2.3 | 3217 | Note sink location | |||
| A2.3 | 3217 | Note fume hood location | |||
| A2.3 | 3310 | Labeled as 3301 | |||
| A2.3 | 3310A | Labeled as 3301A | |||
| A2.6 | Demolition | 4 | 6324 | This will be done as part of Hansma renovation | |
| A3.1A | 1302 | 2 Two cylinder racks | |||
| A3.1A | 1302 | Need chemical/solvent storage | |||
| A3.1A | Renovation | 7 | 1517 | two cylinder racks | |
| A3.1E | L100 | Sound proof doors | |||
| A3.1E | L110 | Sound proof doors | |||
| A3.1E | L201 | Repair ladder | |||
| A3.1E | L201 | Sound proof doors | |||
| A3.2 | 2406 | Need waste storage cabinet | |||
| A3.2 | 2410 | Will be remodeled for Fygenson in Spring of 98 | |||
| A3.2 | 2416 | Will be remodeled for Fygenson in Spring of 98 | |||
| A3.2 | 2513 | Door added to 2517 | |||
| A3.2 | 2517 | Door added to 2513 | |||
| A3.2 | Renovation | 6 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 14 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 15 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 17 | See Fygenson remodel spring 98 | ||
| A3.3 | 3209 | Move fume hood to 3209A | |||
| A3.3 | 3217 | Hood location | |||
| A3.3 | 3217 | Door, Rich Harding | |||
| A3.3 | 3410 | Gas cylinder rack | |||
| A3.3 | 3209A | Note existing door | |||
| A3.3 | How do we upgrade the wall wrt to fire rating | ||||
| A3.4 | 4316 | Replace curtain with swinging door | |||
| A3.4 | 4318 | Fume hood needed | |||
| A3.4 | 4318 | Increase opening | |||
| A3.4 | 4324 | Increase opening | |||
| A3.4 | 4402 | New sink | |||
| A3.4 | 4402 | Gas cylinder rack | |||
| A3.4 | 4406 | New sink | |||
| A3.4 | 4410 | Gas cylinder rack | |||
| A3.4 | 4418 | +/- 1F | |||
| A3.4 | 4513 | Replace sink and case work with solvent storage | |||
| A3.4 | 4513 | 4 Gas cylinder racks | |||
| A3.4 | 4513 | Remove toic gas cabinet | |||
| A3.4 | 4513 | Door added | |||
| A3.4 | 4517 | Remove sink | |||
| A3.4 | 4517 | solvent storage | |||
| A3.5 | 5334 | Snorkel exhaust arm not required | |||
| A3.6 | Renovation | 13 | 6302 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6308 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6310 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6316 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6318 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6324 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6332 | April 98 remodel | |
| A3.7 | Renovation | Exhaust should re-examined See new location for emergency generator | |||
| A4.1 | Revisit intake noise issues | ||||
| A5.7 | Expand the pad as shown on plans to protect roof from astro students. | ||||
| A5.7 | Move emergency generator exhaust to clear space for astro students. | ||||
| A5.7 | Celestron mounting fixtures must remain on roof. | ||||
| A5.7 | Increase pad size to protect roof from Astro students | ||||
| A5.7 | Make sure exhaust stakes do not present a hazard to Astro students | ||||
| E0.01 | Demolition | 1 | No walls removed, not all existing to be removed. | ||
| E0.01 | Demolition | 1 | No walls are to be removed | ||
| E0.01 | Demolition | 1 | Not all existing to be removed | ||
| E0.01 | General | 5 | Physics department will specify conditions underwhich the contractor will work. | ||
| E0.01 | General | 5 | We need clearly specify "conditions" | ||
| E0.01 | General | 11 | We need to be supplied with a set of current "as built" drawings at the completion of the project | ||
| E0.01 | Demolition | 12 | Existing conductors in the labs will be reused. | ||
| E0.01 | Demolition | 12 | All new wiring is not necessary…. | ||
| E0.01 | General | 14 | No disruption of labs not being renovated. | ||
| E0.01 | General | 14 | Clarification required for HVAC work | ||
| E0.01 | General | 20 | Lab equipment that is hardwired needs to be identified by occupants to get it rehardwired. Likewise odd plugs and receptacles that need to be reproduced by contractor need to be called out. | X | |
| E0.01 | General | 20 | Lab equipment will be reconnected by occupant or contractor as occupant sees fit. | ||
| E0.01 | General | 23 | No flexible conduit in labs | ||
| E0.01 | General | 44 | Flush mounting is not required. With few exceptions surface mounting is acceptable. | ||
| E0.01 | General | 44 | Surface mount is acceptable | ||
| E0.01 | General | 47 | We did not agree on separate ground in lab raceway | ||
| E0.01 | General | 47 | Where are the grounds being installed? Early agreement was new grounds from breakers to main panel. No new grounds in lab. | ||
| E0.01 | General | 49 | Leave existing panel boards in labs. What do these specs dictate vis-à-vis demolition. | ||
| E0.01 | General | 49 | Leave existing power oanels | ||
| E0.01 | General | 50 | Replacing receptacles is not cost effective. Broken receptacles should be replaced as maintenance. | ||
| E0.01 | General | 51 | Do not replace all switches. | ||
| E0.01 | General | 53 | Grounding conductors in core but not from breaker panels to outlets in labs. | ||
| E0.01 | General | 53 | Except in labs | ||
| E0.01 | General | 54 | This is applicable to the core only. | ||
| E0.01 | General | 60 | Check electrical noise levels | ||
| E0.01 | General | 61 | Do not replace what is not required . Recent energy bond project | ||
| E0.01 | General | 49,50,51 | Do not replace unless broken or missing | ||
| E0.03 | Remodel | 4 | RELOCATE Emergency Generator | ||
| E0.1R | Communications | 0018 | Add cabletray from Main terminal room to North core small terminal room | ||
| E0.3R | Communications | Core | Add cabletray from Main terminal room to North core small terminal room | ||
| E1.1R | Communications | 1015 | Add 2 communication wallplates | ||
| E1.1R | Communications | 1017 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1019 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.1R | 1209 | Emer 208 3 phase 20 A in core with switch in Lab | |||
| E1.1R | 1209 | 208 3 phase emergency power in lab | |||
| E1.1R | 1302 | Emergency power 208 3phase 60A | |||
| E1.1R | 1302 | Emergency power 208 3phase 30A | |||
| E1.1R | 1302 | Emergency power in core | |||
| E1.1R | 1310 | Add 2 emergengy power as indicated and remove one as indicated | |||
| E1.1R | 1310 | Add one more 208 3 phase 20 A emergency in core | |||
| E1.1R | Communications | 1017A | Add 1 communication wallplate | ||
| E1.2R | Communications | 1020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E1.2R | 1219 | 1 208, 3 phase emergency power 20 A | |||
| E1.2R | 1219 | 3 110 Emergency power | |||
| E1.2R | Communications | 1219 | Add 1 communication wallplate | ||
| E1.2R | 1251 | 3 emergency power outlets 208, 3 phase, 30 A | |||
| E1.2R | 1251 | Outlets on far wall | |||
| E1.2R | 1251 | Door not shown | |||
| E1.2R | 1332 | 110 emergency power in lab | |||
| E1.2R | 1332 | 208 3 phase 20 A emergency in core switched in the lab | |||
| E1.2R | 1356 | 3 110 emergency power | |||
| E1.3R | Communications | 1301 | Add 2 communication wallplates | ||
| E1.3R | Communications | 1311 | Add 2 communication wallplates | ||
| E1.3R | Communications | 1409 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1411 | Add 1 communication wallplate | ||
| E1.3R | 1412 | 2 Communications ports | |||
| E1.3R | Communications | 1413 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1415 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1416 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1450 | Core: close cabletray loop at north end | ||
| E1.3R | Communications | 1450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.3R | 1509 | 120 volt emergency power | |||
| E1.3R | 1517 | 208 Emergency power | |||
| E1.4R | 1366 | Add two more emergency power | |||
| E1.4R | 1380 | Add two emergency power | |||
| E1.4R | 1390 | Add emergency power | |||
| E1.4R | 1362A | Add one more emergency power | |||
| E1.4R | Communications | 1362A | Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.5D | L100 | centralize all electrical panels | |||
| E1.5D | L100 | Repair/replace all bad lamp sockets | |||
| E1.5R | Communications | 1640 | Verify location of 1 communication wallplate | ||
| E1.5R | L100 | Data projector connectors | |||
| E1.5R | L100 | Suspend data projector from ceiling as well as required electrical and communications | |||
| E2.1R | Communications | 2020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.1R | Communications | 2020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E2.1R | 2217 | 110 emergency power in lab | |||
| E2.2R | Communications | 2020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E2.2R | 2217 | One more 110 emergency power | |||
| E2.2R | Communications | 2217 | Add 1 communication wallplate | ||
| E2.2R | 2223 | 110 emergency power in lab | |||
| E2.2R | 2225 | 110 emergency power in lab | |||
| E2.3R | 2402 | Emergency power in core | |||
| E2.3R | 2406 | Emergency power in core | |||
| E2.3R | Communications | 2410 | Move 1 wallplate location | ||
| E2.3R | Communications | 2416 | Move 3 wallplate locations | ||
| E2.3R | Communications | 2419 | Move 1 wallplate location | ||
| E2.3R | 2420 | Emergency power | |||
| E2.3R | 2420 | Emergency power in core | |||
| E2.3R | Communications | 2450 | Core: close cabletray loop at north end | ||
| E2.3R | Communications | 2450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.3R | Communications | 2450 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E2.3R | 2517 | 208 3phaase 20A emergency | |||
| E2.3R | 2517 | 110 V emergency power | |||
| E3.0D | 3310 | See comment about notation 3B should be 2?? | |||
| E3.0D | 3310A | Note breaker panel | |||
| E3.1R | Communications | 3000 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3001 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.1R | 3207 | Note door location | |||
| E3.1R | Communications | 3450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.1R | Communications | 3019A | Add 1 communication wallplate | ||
| E3.2R | Communications | 3020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E3.2R | 3340 | 2 Emergency power outlets | |||
| E3.2R | 3340 | 4 communications ports | |||
| E3.3R | 3409 | Add data port | |||
| E3.3R | 3413 | Add data port | |||
| E3.3R | 3416 | Add data port | |||
| E3.3R | Communications | 3416 | Add 4 120V emergency power duplex receptacles | ||
| E3.3R | Communications | 3450 | Core: close cabletray loop at north end | ||
| E3.3R | 3509 | 6 120V emergency power | |||
| E3.3R | 3509 | 3 220V emergency power | |||
| E3.3R | Communications | 3509 | Add 1 communication wallplate | ||
| E4.1R | Communications | 4020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E4.1R | Communications | 4020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E4.1R | Communications | 4103 | Add 2 communication wallplates | ||
| E4.1R | Communications | 4105 | Add 1 communication wallplate | ||
| E4.1R | Communications | 4111 | Add 1 communication wallplate | ||
| E4.1R | 4113 | 2 Data panels 1' above floor | |||
| E4.1R | Communications | 4113 | Add 1 communication wallplate | ||
| E4.1R | 4123 | Add data port | |||
| E4.1R | 4123 | 2 communications ports | |||
| E4.1R | 4123 | Data panel | |||
| E4.1R | Communications | 4123 | Add 1 communication wallplate | ||
| E4.1R | 4207 | Emergency power | |||
| E4.1R | Communications | 4450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E4.1R | Communications | 4450 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E4.2R | Communications | 4020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E4.2R | 4217 | 110 emergency | |||
| E4.2R | 4223 | 110 emergency | |||
| E4.2R | 4225 | 110 emergency | |||
| E4.2R | 4233 | 110 emergency | |||
| E4.2R | 4239 | 110 emergency | |||
| E4.2R | 4318 | 120 volt emergency power in core | |||
| E4.2R | 4318 | 120V emergency power | |||
| E4.2R | 4324 | 2 120V emergency power | |||
| E4.2R | 4326 | 2 120V emergency power | |||
| E4.2R | 4332 | 2 120V emergency power | |||
| E4.2R | Communications | 4332 | Add 1 communication wallplate | ||
| E4.2R | 4334 | 2 120V emergency power | |||
| E4.2R | 4340 | 2 120V emergency power | |||
| E4.3R | 4402 | emergency power in core | |||
| E4.3R | 4402 | Emergency power | |||
| E4.3R | 4406 | emergency power in core | |||
| E4.3R | 4406 | 2 emergency power outlets | |||
| E4.3R | 4409 | Emergency power | |||
| E4.3R | 4410 | Emergency power | |||
| E4.3R | 4410 | emergency power in core | |||
| E4.3R | 4411 | Emergency power | |||
| E4.3R | 4412 | Emergency power | |||
| E4.3R | 4415 | Emergency power | |||
| E4.3R | 4418 | 2 Emergency power outlets | |||
| E4.3R | 4418 | 2 pumps in core | |||
| E4.3R | 4418 | 2 Emergency power outlets in the core | |||
| E4.3R | 4419 | Emergency power | |||
| E4.3R | Communications | 4450 | Core: close cabletray loop at north end | ||
| E4.3R | 4509 | emergency power in core | |||
| E4.3R | 4513 | emergency power in core | |||
| E4.3R | 4517 | emergency power in core | |||
| E5.1R | Communications | 5020 | Move 5th floor main communications terminal from 5217 to Core | ||
| E5.1R | Communications | 5020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E5.1R | Communications | 5124 | Add 1 communication wallplate | ||
| E5.1R | Communications | 5131 | Add 1 communication wallplate | ||
| E5.2R | Communications | 5020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E5.2R | Communications | 5215 | Add 1 communication wallplate | ||
| E5.2R | Communications | 5217 | Replace 5th floor main communications terminal (now in core) w/subterminal | ||
| E5.2R | Communications | 5217 | Add 1 120V emergency power duplex receptacles | ||
| E5.2R | Communications | 5223 | Add 1 subterminal | ||
| E6.1R | Communications | 6020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E6.1R | Communications | 6105 | Move location of 1 communication wallplate | ||
| E6.1R | Communications | 6123 | Add 1 communication wallplate | ||
| E6.1R | Communications | 6204 | Add 1 communication wallplate | ||
| E6.2R | Communications | 6020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E6.2R | Communications | 6212 | Add 1 communication wallplate | ||
| E7.1R | Communications | Roof | Add 6 communication wallplates | ||
| E7.2R | Communications | Roof | Add 3 communication wallplates | ||
| M0.0D | Demolition | 18 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1D | 1219 | 2 Vac exhausts | |||
| M1.1D | 1356 | 2 Vac exhausts | |||
| M1.1D | Demolition | 6 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1R | 1207 | +/- 1/2F | |||
| M1.1R | 1209 | Heat exchanger in core | |||
| M1.1R | 1209 | +/- 1/2F | |||
| M1.1R | 1302 | Heat exchangers are not indicated for equipment. | |||
| M1.1R | 1310 | 2 Vac pump exhaust in lab and 2 in core | |||
| M1.1R | 1310 | Move heat exchangers into the core | |||
| M1.1R | Need cooling water | ||||
| M1.2D | 1380 | Cooling chiller CH-1, Pump P-1 removed?? | |||
| M1.2D | Demolition | 2 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.2D | Remove (E) AC-3 | ||||
| M1.2R | 1332 | Pump in core cooling water? | |||
| M1.2R | 1332 | Heat exchanger in core | |||
| M1.2R | 1332 | +/- 1/2 F | |||
| M1.2R | 1356 | Fume hood and chem and solvent storage | |||
| M1.2R | 1251A | Cooling water in here | |||
| M1.2R | 1251A | Air inlet but there is no air outlet??? | |||
| M1.3D | L100 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| M1.3D | L108 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| M1.3D | L110 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| M1.3D | Demolition | 8 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | Missing sheets | |
| M1.3D | Work in lecture halls must take place in summer time | Missing sheets | |||
| M1.3R | 1509 | Move exhaust to accommodate shelving | |||
| M1.3R | 1509 | Vac pump exhaust | |||
| M1.3R | 1517 | rotate fume hood | |||
| M1.3R | 1517 | Vac pump exhaust | |||
| M1.3R | item 15 should be labeld as 14? | ||||
| M1.4R | 1362 | Replace AC-3 | |||
| M1.4R | 1366 | Vac pump exhaust | |||
| M1.4R | 1380 | 2 20 kW heat exchangers | |||
| M1.4R | 1380 | 4 Vac pump exhaust | |||
| M1.4R | 1362B | Fume hood with chem storage | |||
| M1.4R | 1390A | Vac pump exhaust | |||
| M1.4R | 1390A | 60 kW heat exchanger | |||
| M-2 | HVAC Schedule | 1217 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Lab Utility | 1310 | Add 2 1 1/2" diameter vacuum pump exhaust outlet in Lab Add 2 1 1/2" diameter vacuum pump exhaust in core provide plumbing to heat exchangers 2 in core | ||
| M-2 | HVAC Schedule | 1310 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1310 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1324 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1362 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1366 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1380 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1390 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1412 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1509 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1517 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 2402 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 2406 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 2410 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 2509 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 2517 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 3217 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 3406 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 3410 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 3509 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 3513 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4207 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4308 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4318 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4324 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4326 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4333 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4334 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4340 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 4513 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 6324 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1215A | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1390A | Occupant check HVAC Schedule | ||
| M2.1R | 2207 | Vac exhaust | |||
| M2.1R | 2217 | 6' Fume hood chem and solvent storage | |||
| M2.1R | 2217 | 2 Vac exhaust | |||
| M2.3R | 2517 | 2 1 1/2" OD Vac pump exhaust | |||
| M2.3R | 2517 | Heat exchanger in the lab | |||
| M2.3R | 2517 | Pump in core | |||
| M2.3R | 2517 | 5 ' Laminar Flow Fume Hood, flammable chem storage | |||
| M2.3R | 2517 | Heat exchanger in the core, 3kW aircooled unit | |||
| M2.3R | Need cooling water for stills | ||||
| M3.2R | 11 New fresh air intake. How do we accommodate Lubin's hoist? | ||||
| M3.3R | 3406 | 3 >>5 | |||
| M3.3R | 3406 | No air return? | |||
| M3.3R | 3410 | Air return different from 3513,3509?? | |||
| M3.3R | 3509 | 60 kW heat exchanger in core | |||
| M3.3R | 3517 | See fume hood location | |||
| M4.1R | 4103 | Provide separate controls and ducts, existing ducts inadequate | |||
| M4.1R | 4105 | Provide separate controls and ducts, existing ducts inadequate | |||
| M4.1R | 4207 | Exhaust | |||
| M4.1R | 4207 | Heat exchanger in core | |||
| M4.2R | 4217 | +/- 1/2 F | |||
| M4.2R | 4217 | Vac exhaust | |||
| M4.2R | 4223 | +/- 1/2 F | |||
| M4.2R | 4225 | +/- 1/2 F | |||
| M4.2R | 4225 | heat exchanger in core | |||
| M4.2R | 4233 | +/- 1/2 F | |||
| M4.2R | 4239 | +/- 1/2 F | |||
| M4.2R | 4318 | cooling for diff pump | |||
| M4.2R | 4318 | dry box in center of room | |||
| M4.2R | 4324 | Pressure regulator on DI water / 20 psi | |||
| M4.2R | 4326 | Move heat exchangers from 4334 to 4326 | |||
| M4.2R | 4326 | Heat exchanger | |||
| M4.2R | 4340 | Move heat exchangers from 4332 to 4340 | |||
| M4.2R | 4340 | See heat exchanger location | |||
| M4.3R | 4402 | Heat exchanger | |||
| M4.3R | 4410 | Heat exchanger | |||
| M4.3R | 4418 | cooling for 2 diff pump | |||
| M4.3R | 4509 | Heat exchanger | |||
| M4.3R | 4513 | Existing gas cabinet | |||
| M4.3R | 4513 | Gas cabinet for hazardous gas IPOS | |||
| M4.3R | 4513 | Diff pump | |||
| M4.3R | 4513 | Existing compresseed gas cabinet | |||
| M4.3R | 4517 | Heat exchanger for magnet, diff pumps and laser | |||
| M6.0D | Missing 5th floor demo plan | ||||
| M6.2R | Pleased to note : For labs requiring humidity control, electric humidifiers shall be…. What does this mean? | ||||
| M7.2R | 7389 | Room in stairwell should be suitable for storage and access. | |||
| M7.2R | 7389 | Storage area at top of stairs has a hazardous step into space | |||
| M7.2R | Exhaust towers should be located and terminated so as to provide no hazard to astro-students on roof. | ||||
| M7.2R | Expand the pad as shown on plans to protect roof from astro students. | ||||
| M7.2R | Move emergency generator exhaust to clear space for astro students. | ||||
| M7.2R | Celestron mounting fixtures must remain on roof. | ||||
| M7.2R | Increase pad size to protect roof from Astro students | ||||
| M7.2R | Make sure exhaust stakes do not present a hazard to Astro students | ||||
| P0.2D | Demolition | 1 | Vacuum pump need not go? | ||
| P0.2D | Sprinkler note core wall and front wall!! | ||||
| P0.2R | Spinkler Note | All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL and FRONT WALL SPRINKLERS | |||
| P0.3D | Demolition | 1 | Remove existing vacuum pump?? Necessary?? | ||
| P0.3R | Spinkler Note | All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL OR FRONT WALL SPRINKLERS | |||
| P-1 | Lab Equipment Schedule | FH 5 | Add DI water | ||
| P-1 | FH/5 is a Laminar Flow Fume hood 5' long | ||||
| P1.1R | 1014 | Completed as part of PSR ADA. Not necessary | |||
| P1.1R | 1302 | Heat exchanger | |||
| P1.1R | 1302 | Magnet cooling water 15kW, 3 gpm | |||
| P1.1R | 1302 | New Sink | |||
| P1.1R | 2410 | See Feygenson remodel | |||
| P1.1R | General | 2 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 3 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 4 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 6 | Lavatories on first floor were recently redone | ||
| P1.2R | 1215 | vacuun exhaust | |||
| P1.2R | 1217 | 2 vacuum exhaust | |||
| P1.2R | Remodel | 13 | 1251 | New nitogen line | |
| P1.2R | 1251 | 2 nitrogen | |||
| P1.2R | 1251 | 2 compressed air | |||
| P1.2R | 1324 | 2 vacuum exhaust | |||
| P1.2R | 1324 | 3 nitrogen | |||
| P1.2R | 1332 | Sink stays | |||
| P1.2R | 1332 | 2 Nitrogen lines | |||
| P1.2R | 1356 | Replace sink | |||
| P1.2R | 1322A | DI water | |||
| P1.2R | 1322A | Compressed Air | |||
| P1.2R | 1322B | Nitrogen | |||
| P1.2R | Core | Nitrogen | |||
| P1.3R | 1412 | 2 vacuum exhaust | |||
| P1.3R | 1412 | 3 nitrogen | |||
| P1.3R | 1412 | 2 120 emergency power in core | |||
| P1.3R | 1412 | 1 208 emergency in core | |||
| P1.3R | 1416 | 5 kW heat exchanger | |||
| P1.3R | 1517 | Emergency shower piping at ceiling . | |||
| P1.3R | |||||
| P1.4R | 1380 | Locate fume hood in 1326B | |||
| P1.4R | 1380 | Add 3 nitrogen outlets | |||
| P1.4R | 1362B | DI water in sink | |||
| P1.4R | 1362B | FH/11 8' located here with chem and solvent storage | |||
| P1.5R | L107 | Add hot water | |||
| P1.5R | L107 | Add DI water | |||
| P2.1R | 2207 | Replace existing sink | |||
| P2.1R | 2310A | Bring DI water to location of sink | |||
| P2.2R | 2217 | Add sink | |||
| P2.2R | 2332 | Bring DI water to location of sink | |||
| P2.2R | 2334 | Bring DI water to location of sink | |||
| P2.3R | 2402 | DI water in two locations | |||
| P2.3R | 2402 | Nitrogen | |||
| P2.3R | 2402 | Vac pump | |||
| P2.3R | 2406 | DI water in two locations | |||
| P2.3R | 2406 | Nitrogen | |||
| P2.3R | 2406 | Vac pump | |||
| P2.3R | 2406 | 2 Fume hoods | |||
| P2.3R | 2420 | Note nitrogen location | |||
| P2.3R | 2420 | Vac pump in core | |||
| P2.3R | 2509 | 3 compressed air | |||
| P2.3R | 2509 | 3 nitrogen | |||
| P2.3R | 2509 | vacuum exhaust | |||
| P2.3R | 2509 | 120 volt emergency power in core | |||
| P2.3R | 2517 | New nitrogen plumbing | |||
| P2.3R | 2517 | DI water plumbed into sink with separate tap | |||
| P3.1D | 3301 | Actual room number is 3310 | |||
| P3.1D | 3301A | Actual room number is 3310A | |||
| P3.1R | 3207 | Note existing location of door | |||
| P3.1R | 3209 | Note location of exhaust hood | |||
| P3.1R | 3301 | Actual room number is 3310 | |||
| P3.1R | 3302 | Note location of sink for DI water | |||
| P3.1R | 3209A | Note exhaust hood | |||
| P3.1R | 3209A | Bring DI water to location of sink | |||
| P3.1R | 3301A | Actual room number is 3310A | |||
| P3.1R | 3310A | DI water comes to sink | |||
| P3.2D | 3217 | Relocate sink | |||
| P3.2R | 3209 | No fume hood indicated | |||
| P3.2R | 3214 | Bring DI into noted location | |||
| P3.2R | 3217 | DI water to existing sink | |||
| P3.2R | 3217 | Note location of fume hood | |||
| P3.3R | 3409 | Note correct room number | |||
| P3.3R | 3513 | Note room number | |||
| P3.3R | 3513 | 60 kW heat exchanger in core | |||
| P3.3R | 3517 | Not correct location of hood FH8 | |||
| P3.3R | 3517 | DI water to hood | |||
| P4.1R | 4207 | Add sink | |||
| P4.1R | Core | Nitrogen | |||
| P4.2R | 4318 | New fume hood w/sink | |||
| P4.2R | 4318 | DI water | |||
| P4.2R | 4318 | Nitrogen | |||
| P4.2R | 4324 | DI pressure regulator 10-50 PSIG | |||
| P4.2R | 4324 | DI water plumbed into existing sink | |||
| P4.2R | 4332 | Nitrogen | |||
| P4.2R | 4340 | DI water plumbed into existing sink | |||
| P4.2R | 4215A | Sink stays | |||
| P4.2R | 4215A | DI water add | |||
| P4.2R | Core | Nitrogen | |||
| P4.3R | 4402 | Nitrogen | |||
| P4.3R | 4402 | DI to sink | |||
| P4.3R | 4406 | Remove equipment cooling plumbing | |||
| P4.3R | 4410 | Nitrogen | |||
| P4.3R | 4412 | Remove equipment cooling plumbing | |||
| P4.3R | 4418 | Nitrogen | |||
| P4.3R | 4509 | Nitrogen | |||
| P4.3R | 4513 | Nitrogen | |||
| P4.3R | 4513 | DI water to sink as noted | |||
| P4.3R | 4517 | Nitrogen | |||
| S3.1 | 2 | Emergency generator | |||
| 3340 | 3 Communications plates not 4. | ||||
| 4123 | There should be two complete communcation ports / plates in this office. This will necessitate two telephone lines. | ||||
| 4324 | Second exit not required | ||||