| Page # | Generic | Room # | Comments | Lab occupant alert | |
| A1.1 | 2 | Emergency generator should be relocated to area behind nitrogen storage | |||
| A2.1A | Demolition | 16 | 1000 | Not necessary to demolish paving | |
| A2.1A | Demolition | 9 | 1509 | Not necessary to demolish snorkel arm | |
| A2.1A | Demolition | 9 | 1517 | Not necessary to demolish snorkel arm | |
| A2.1R | 1509 | Why remove the snorkel exhasut arm? | |||
| A2.1R | 1517 | Why remove the snorkel exhasut arm? | |||
| A2.2 | 2410 | 2 each fume hoods removed and replaced with laminar bio cab for 2410 reno. Project | |||
| A2.3 | 3207 | Note door location | |||
| A2.3 | 3217 | Note sink location | |||
| A2.3 | 3217 | Note fume hood location | |||
| A2.3 | 3310 | Labeled as 3301 | |||
| A2.3 | 3310A | Labeled as 3301A | |||
| A2.6 | Demolition | 4 | 6324 | This will be done as part of Hansma renovation | |
| A3.1A | Renovation | 7 | 1517 | two cylinder racks | |
| A3.1A | 1302 | 2 Two cylinder racks | |||
| A3.1A | 1302 | Need chemical/solvent storage | |||
| A3.1E | L100 | Sound proof doors | |||
| A3.1E | L110 | Sound proof doors | |||
| A3.1E | L201 | Repair ladder | |||
| A3.1E | L201 | Sound proof doors | |||
| A3.2 | Renovation | 6 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 14 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 15 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 17 | See Fygenson remodel spring 98 | ||
| A3.2 | 2406 | Need waste storage cabinet | |||
| A3.2 | 2410 | Will be remodeled for Fygenson in Spring of 98 | |||
| A3.2 | 2416 | Will be remodeled for Fygenson in Spring of 98 | |||
| A3.3 | 3209 | Move fume hood to 3209A | |||
| A3.3 | 3217 | Hood location | |||
| A3.3 | 3410 | Gas cylinder rack | |||
| A3.3 | 3209A | Note existing door | |||
| A3.3 | How do we upgrade the wall wrt to fire rating | ||||
| A3.4 | 4316 | Replace curtain with swinging door | |||
| A3.4 | 4318 | Fume hood needed | |||
| A3.4 | 4402 | New sink | |||
| A3.4 | 4402 | Gas cylinder rack | |||
| A3.4 | 4406 | New sink | |||
| A3.4 | 4410 | Gas cylinder rack | |||
| A3.4 | 4418 | +/- 1F | |||
| A3.4 | 4513 | Replace sink and case work with solvent storage | |||
| A3.4 | 4513 | 4 Gas cylinder racks | |||
| A3.4 | 4513 | Remove toic gas cabinet | |||
| A3.4 | 4517 | Remove sink | |||
| A3.4 | 4517 | solvent storage | |||
| A3.5 | 5334 | Snorkel exhaust arm not required | |||
| A3.6 | Renovation | 13 | 6302 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6308 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6310 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6316 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6318 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6324 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6332 | April 98 remodel | |
| A3.7 | Renovation | Exhaust should re-examined See new location for emergency generator | |||
| A4.1 | Revisit intake noise issues | ||||
| E0.01 | Demolition | 1 | No walls removed, not all existing to be removed. | ||
| E0.01 | Demolition | 12 | Existing conductors in the labs will be reused. | ||
| E0.01 | Demolition | 1 | No walls are to be removed | ||
| E0.01 | Demolition | 1 | Not all existing to be removed | ||
| E0.01 | Demolition | 12 | All new wiring is not necessary…. | ||
| E0.01 | General | 5 | Physics department will specify conditions underwhich the contractor will work. | ||
| E0.01 | General | 14 | No disruption of labs not being renovated. | ||
| E0.01 | General | 20 | Lab equipment that is hardwired needs to be identified by occupants to get it rehardwired. Likewise odd plugs and receptacles that need to be reproduced by contractor need to be called out. | X | |
| E0.01 | General | 44 | Flush mounting is not required. With few exceptions surface mounting is acceptable. | ||
| E0.01 | General | 49 | Leave existing panel boards in labs. What do these specs dictate vis-à-vis demolition. | ||
| E0.01 | General | 50 | Replacing receptacles is not cost effective. Broken receptacles should be replaced as maintenance. | ||
| E0.01 | General | 51 | Do not replace all switches. | ||
| E0.01 | General | 53 | Grounding conductors in core but not from breaker panels to outlets in labs. | ||
| E0.01 | General | 54 | This is applicable to the core only. | ||
| E0.01 | General | 5 | We need clearly specify "conditions" | ||
| E0.01 | General | 11 | We need to be supplied with a set of current "as built" drawings at the completion of the project | ||
| E0.01 | General | 14 | Clarification required for HVAC work | ||
| E0.01 | General | 20 | Lab equipment will be reconnected by occupant or contractor as occupant sees fit. | ||
| E0.01 | General | 23 | No flexible conduit in labs | ||
| E0.01 | General | 44 | Surface mount is acceptable | ||
| E0.01 | General | 47 | We did not agree on separate ground in lab raceway | ||
| E0.01 | General | 49 | Leave existing power oanels | ||
| E0.01 | General | 49,50,51 | Do not replace unless broken or missing | ||
| E0.01 | General | 53 | Except in labs | ||
| E0.01 | General | 60 | Check electrical noise levels | ||
| E0.01 | General | 61 | Do not replace what is not required . Recent energy bond project | ||
| E0.01 | General | 47 | Where are the grounds being installed? Early agreement was new grounds from breakers to main panel. No new grounds in lab. | ||
| E1.1R | 1302 | Emergency power 208 3phase 60A | |||
| E1.1R | 1302 | Emergency power 208 3phase 30A | |||
| E1.1R | 1302 | Emergency power in core | |||
| E1.2R | 1251 | 3 emergency power outlets 208, 3 phase, 30 A | |||
| E1.2R | 1251 | Outlets on far wall | |||
| E1.2R | 1251 | Door not shown | |||
| E1.3R | 1412 | 2 Communications ports | |||
| E1.3R | 1509 | 120 volt emergency power | |||
| E1.3R | 1517 | 208 Emergency power | |||
| E1.5D | L100 | centralize all electrical panels | |||
| E1.5D | L100 | Repair/replace all bad lamp sockets | |||
| E1.5R | L100 | Data projector connectors | |||
| E1.5R | L100 | Suspend data projector from ceiling as well as required electrical and communications | |||
| E2.3R | 2402 | Emergency power in core | |||
| E2.3R | 2406 | Emergency power in core | |||
| E2.3R | 2420 | Emergency power | |||
| E2.3R | 2420 | Emergency power in core | |||
| E3.0D | 3310 | See comment about notation 3B should be 2?? | |||
| E3.0D | 3310A | Note breaker panel | |||
| E3.1R | 3207 | Note door location | |||
| E3.2R | 3340 | 2 Emergency power outlets | |||
| E3.2R | 3340 | 4 communications ports | |||
| E3.3R | 3409 | Add data port | |||
| E3.3R | 3413 | Add data port | |||
| E3.3R | 3416 | Add data port | |||
| E3.3R | 3509 | 6 120V emergency power | |||
| E3.3R | 3509 | 3 220V emergency power | |||
| E4.1R | 4123 | Add data port | |||
| E4.1R | 4123 | 2 communications ports | |||
| E4.2R | 4318 | 120 volt emergency power in core | |||
| E4.2R | 4318 | 120V emergency power | |||
| E4.2R | 4324 | 2 120V emergency power | |||
| E4.2R | 4326 | 2 120V emergency power | |||
| E4.2R | 4332 | 2 120V emergency power | |||
| E4.2R | 4334 | 2 120V emergency power | |||
| E4.2R | 4340 | 2 120V emergency power | |||
| E4.3R | 4402 | emergency power in core | |||
| E4.3R | 4402 | Emergency power | |||
| E4.3R | 4406 | emergency power in core | |||
| E4.3R | 4406 | 2 emergency power outlets | |||
| E4.3R | 4409 | Emergency power | |||
| E4.3R | 4410 | Emergency power | |||
| E4.3R | 4410 | emergency power in core | |||
| E4.3R | 4411 | Emergency power | |||
| E4.3R | 4412 | Emergency power | |||
| E4.3R | 4415 | Emergency power | |||
| E4.3R | 4418 | 2 Emergency power outlets | |||
| E4.3R | 4418 | 2 pumps in core | |||
| E4.3R | 4418 | 2 Emergency power outlets in the core | |||
| E4.3R | 4419 | Emergency power | |||
| E4.3R | 4509 | emergency power in core | |||
| E4.3R | 4513 | emergency power in core | |||
| E4.3R | 4517 | emergency power in core | |||
| M0.0D | Demolition | 18 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1D | Demolition | 6 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1R | 1302 | Heat exchangers are not indicated for equipment. | |||
| M1.1R | Need cooling water | ||||
| M1.2D | Demolition | 2 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.2D | Remove (E) AC-3 | ||||
| M1.2R | 1332 | Pump in core cooling water? | |||
| M1.2R | 1251A | Cooling water in here | |||
| M1.2R | 1251A | Air inlet but there is no air outlet??? | |||
| M1.3D | Demolition | 8 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.3D | L100 | Thermostats removed to 1630 to make student proof | |||
| M1.3D | L108 | Thermostats removed to 1630 to make student proof | |||
| M1.3D | L110 | Thermostats removed to 1630 to make student proof | |||
| M1.3D | Work in lecture halls must take place in summer time | ||||
| M1.3R | 1509 | Move exhaust to accommodate shelving | |||
| M1.3R | 1517 | rotate fume hood | |||
| M1.3R | item 15 should be labeld as 14? | ||||
| M1.4R | 1362 | Replace AC-3 | |||
| M1.4R | 1362B | Fume hood with chem storage | |||
| M2.3R | Need cooling water for stills | ||||
| M3.2R | 11 New fresh air intake. How do we accommodate Lubin's hoist? | ||||
| M3.3R | 3406 | 3 >>5 | |||
| M3.3R | 3406 | No air return? | |||
| M3.3R | 3410 | Air return different from 3513,3509?? | |||
| M3.3R | 3509 | 60 kW heat exchanger in core | |||
| M3.3R | 3517 | See fume hood location | |||
| M4.2R | 4318 | cooling for diff pump | |||
| M4.2R | 4318 | dry box in center of room | |||
| M4.2R | 4324 | Pressure regulator on DI water / 20 psi | |||
| M4.2R | 4326 | Move heat exchangers from 4334 to 4326 | |||
| M4.2R | 4326 | Heat exchanger | |||
| M4.2R | 4340 | Move heat exchangers from 4332 to 4340 | |||
| M4.2R | 4340 | See heat exchanger location | |||
| M4.3R | 4402 | Heat exchanger | |||
| M4.3R | 4410 | Heat exchanger | |||
| M4.3R | 4418 | cooling for 2 diff pump | |||
| M4.3R | 4509 | Heat exchanger | |||
| M4.3R | 4513 | Existing gas cabinet | |||
| M4.3R | 4513 | Gas cabinet for hazardous gas IPOS | |||
| M4.3R | 4513 | Diff pump | |||
| M4.3R | 4517 | Heat exchanger for magnet, diff pumps and laser | |||
| M6.0D | Missing 5th floor demo plan | ||||
| M6.2R | Pleased to note : For labs requiring humidity control, electric humidifiers shall be…. What does this mean? | ||||
| M7.2R | Exhaust towers should be located and terminated so as to provide no hazard to astro-students on roof. | ||||
| M7.2R | Room in stairwell should be suitable for storage and access. | ||||
| M7.2R | Expand the pad as shown on plans to protect roof from astro students. | ||||
| M7.2R | Move emergency generator exhaust to clear space for astro students. | ||||
| M7.2R | Celestron mounting fixtures must remain on roof. | ||||
| P0.2D | Demolition | 1 | Vacuum pump need not go? | ||
| P0.2D | Sprinkler note core wall or front wall!! | ||||
| P0.2R | Spinkler Note | All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL OR FRONT WALL SPRINKLERS | |||
| P0.3D | Demolition | 1 | Remove existing vacuum pump?? Necessary?? | ||
| P0.3R | Spinkler Note | All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL OR FRONT WALL SPRINKLERS | |||
| P-1 | Lab Equipment Schedule | FH 5 | Add DI water | ||
| P1.1R | General | 2 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 3 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 4 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 6 | Lavatories on first floor were recently redone | ||
| P1.1R | 1014 | Completed as part of PSR ADA. Not necessary | |||
| P1.1R | 1302 | Heat exchanger | |||
| P1.1R | 1302 | Magnet cooling water 15kW, 3 gpm | |||
| P1.1R | 1302 | New Sink | |||
| P1.1R | 2410 | See Feygenson remodel | |||
| P1.2R | Remodel | 13 | 1251 | New nitogen line | |
| P1.2R | 1215 | vacuun exhaust | |||
| P1.2R | 1217 | 2 vacuum exhaust | |||
| P1.2R | 1251 | 2 nitrogen | |||
| P1.2R | 1251 | 2 compressed air | |||
| P1.2R | 1324 | 2 vacuum exhaust | |||
| P1.2R | 1324 | 3 nitrogen | |||
| P1.2R | 1322A | DI water | |||
| P1.2R | 1322A | Compressed Air | |||
| P1.2R | 1322B | Nitrogen | |||
| P1.3R | 1412 | 2 vacuum exhaust | |||
| P1.3R | 1412 | 3 nitrogen | |||
| P1.3R | 1412 | 2 120 emergency power in core | |||
| P1.3R | 1412 | 1 208 emergency in core | |||
| P1.3R | 1416 | 5 kW heat exchanger | |||
| P1.3R | 1517 | Emergency shower piping at ceiling . | |||
| P1.3R | |||||
| P1.4R | 1380 | Locate fume hood in 1326B | |||
| P1.5R | L107 | Add hot water | |||
| P1.5R | L107 | Add DI water | |||
| P2.1R | 2310A | Bring DI water to location of sink | |||
| P2.2R | 2332 | Bring DI water to location of sink | |||
| P2.2R | 2334 | Bring DI water to location of sink | |||
| P2.3R | 2402 | DI water in two locations | |||
| P2.3R | 2402 | Nitrogen | |||
| P2.3R | 2402 | Vac pump | |||
| P2.3R | 2406 | DI water in two locations | |||
| P2.3R | 2406 | Nitrogen | |||
| P2.3R | 2406 | Vac pump | |||
| P2.3R | 2406 | 2 Fume hoods | |||
| P2.3R | 2420 | Note nitrogen location | |||
| P2.3R | 2420 | Vac pump in core | |||
| P2.3R | 2509 | 3 compressed air | |||
| P2.3R | 2509 | 3 nitrogen | |||
| P2.3R | 2509 | vacuum exhaust | |||
| P2.3R | 2509 | 120 volt emergency power in core | |||
| P3.1D | 3301 | Actual room number is 3310 | |||
| P3.1D | 3301A | Actual room number is 3310A | |||
| P3.1R | 3207 | Note existing location of door | |||
| P3.1R | 3209 | Note location of exhaust hood | |||
| P3.1R | 3301 | Actual room number is 3310 | |||
| P3.1R | 3302 | Note location of sink for DI water | |||
| P3.1R | 3209A | Note exhaust hood | |||
| P3.1R | 3209A | Bring DI water to location of sink | |||
| P3.1R | 3301A | Actual room number is 3310A | |||
| P3.1R | 3310A | DI water comes to sink | |||
| P3.2D | 3217 | Relocate sink | |||
| P3.2R | 3209 | No fume hood indicated | |||
| P3.2R | 3214 | Bring DI into noted location | |||
| P3.2R | 3217 | DI water to existing sink | |||
| P3.2R | 3217 | Note location of fume hood | |||
| P3.3R | 3409 | Note correct room number | |||
| P3.3R | 3513 | Note room number | |||
| P3.3R | 3513 | 60 kW heat exchanger in core | |||
| P3.3R | 3517 | Not correct location of hood FH8 | |||
| P3.3R | 3517 | DI water to hood | |||
| P4.2R | 4318 | New fume hood w/sink | |||
| P4.2R | 4318 | DI water | |||
| P4.2R | 4318 | Nitrogen | |||
| P4.2R | 4324 | DI pressure regulator 10-50 PSIG | |||
| P4.2R | 4332 | Nitrogen | |||
| P4.3R | 4402 | Nitrogen | |||
| P4.3R | 4402 | DI to sink | |||
| P4.3R | 4406 | Remove equipment cooling plumbing | |||
| P4.3R | 4410 | Nitrogen | |||
| P4.3R | 4412 | Remove equipment cooling plumbing | |||
| P4.3R | 4418 | Nitrogen | |||
| P4.3R | 4509 | Nitrogen | |||
| P4.3R | 4513 | Nitrogen | |||
| P4.3R | 4513 | DI water to sink as noted | |||
| P4.3R | 4517 | Nitrogen | |||
| S3.1 | 2 | Emergency generator | |||