Design Develpoment Drawings


Page #   Generic Room # Comments Lab occupant alert
0 0 0 0 Cooling water pipies not shown  
0 0 0 0 Vac pump exhaust detail is not settled.  
0 0 0 0 There are no special temperature and humidity documented. The whole building appears to be controlled at +/- 1 F  
0 0 0 0 Occupant's should view cheap heat exchangers and decide where they are acceptable.  
A2.1A Demolition 16 1000 Not necessary to demolish paving  
P1.1R     1014 Completed as part of PSR ADA. Not necessary  
E1.1R Communications   1015 Add 2 communication wallplates  
E1.1R Communications   1017 Add 1 communication wallplate  
E1.1R Communications   1019 Add 1 communication wallplate  
E1.1R Communications   1020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E1.2R Communications   1020 Core: close cabletray loop at east end, have CT crossover at bridge  
M1.1R     1207 +/- 1/2F  
E1.1R     1209 Emer 208 3 phase 20 A in core with switch in Lab  
E1.1R     1209 208 3 phase emergency power in lab  
M1.1R     1209 Heat exchanger in core  
M1.1R     1209 +/- 1/2F  
P1.2R     1215 vacuun exhaust  
M-2 HVAC Schedule   1217 Occupant check HVAC Schedule  
P1.2R     1217 2 vacuum exhaust  
E1.2R     1219 1 208, 3 phase emergency power 20 A  
E1.2R     1219 3 110 Emergency power  
E1.2R Communications   1219 Add 1 communication wallplate  
M1.1D     1219 2 Vac exhausts  
E1.2R     1251 3 emergency power outlets 208, 3 phase, 30 A  
E1.2R     1251 Outlets on far wall  
E1.2R     1251 Door not shown  
P1.2R Remodel 13 1251 New nitogen line  
P1.2R     1251 2 nitrogen  
P1.2R     1251 2 compressed air  
E1.3R Communications   1301 Add 2 communication wallplates  
A3.1A     1302 2 Two cylinder racks  
A3.1A     1302 Need chemical/solvent storage  
E1.1R     1302 Emergency power 208 3phase 60A  
E1.1R     1302 Emergency power 208 3phase 30A  
E1.1R     1302 Emergency power in core  
M1.1R     1302 Heat exchangers are not indicated for equipment.  
P1.1R     1302 Heat exchanger  
P1.1R     1302 Magnet cooling water 15kW, 3 gpm  
P1.1R     1302 New Sink  
E1.1R     1310 Add 2 emergengy power as indicated and remove one as indicated  
E1.1R     1310 Add one more 208 3 phase 20 A emergency in core  
M1.1R     1310 2 Vac pump exhaust in lab and 2 in core  
M1.1R     1310 Move heat exchangers into the core  
M-2 HVAC Lab Utility   1310 Add 2 1 1/2" diameter vacuum pump exhaust outlet in Lab Add 2 1 1/2" diameter vacuum pump exhaust in core provide plumbing to heat exchangers 2 in core  
M-2 HVAC Schedule   1310 Occupant check HVAC Schedule  
M-2 HVAC Schedule   1310 Occupant check HVAC Schedule  
E1.3R Communications   1311 Add 2 communication wallplates  
M-2 HVAC Schedule   1324 Occupant check HVAC Schedule  
P1.2R     1324 2 vacuum exhaust  
P1.2R     1324 3 nitrogen  
E1.2R     1332 110 emergency power in lab  
E1.2R     1332 208 3 phase 20 A emergency in core switched in the lab  
M1.2R     1332 Pump in core cooling water?  
M1.2R     1332 Heat exchanger in core  
M1.2R     1332 +/- 1/2 F  
P1.2R     1332 Sink stays  
P1.2R     1332 2 Nitrogen lines  
E1.2R     1356 3 110 emergency power  
M1.1D     1356 2 Vac exhausts  
M1.2R     1356 Fume hood and chem and solvent storage  
P1.2R     1356 Replace sink  
M1.4R     1362 Replace AC-3  
M-2 HVAC Schedule   1362 Occupant check HVAC Schedule  
E1.4R     1366 Add two more emergency power  
M1.4R     1366 Vac pump exhaust  
M-2 HVAC Schedule   1366 Occupant check HVAC Schedule  
E1.4R     1380 Add two emergency power  
M1.2D     1380 Cooling chiller CH-1, Pump P-1 removed??  
M1.4R     1380 2 20 kW heat exchangers  
M1.4R     1380 4 Vac pump exhaust  
M-2 HVAC Schedule   1380 Occupant check HVAC Schedule  
P1.4R     1380 Locate fume hood in 1326B  
P1.4R     1380 Add 3 nitrogen outlets  
E1.4R     1390 Add emergency power  
M-2 HVAC Schedule   1390 Occupant check HVAC Schedule  
E1.3R Communications   1409 Add 1 communication wallplate  
E1.3R Communications   1411 Add 1 communication wallplate  
E1.3R     1412 2 Communications ports  
M-2 HVAC Schedule   1412 Occupant check HVAC Schedule  
P1.3R     1412 2 vacuum exhaust  
P1.3R     1412 3 nitrogen  
P1.3R     1412 2 120 emergency power in core  
P1.3R     1412 1 208 emergency in core  
E1.3R Communications   1413 Add 1 communication wallplate  
E1.3R Communications   1415 Add 1 communication wallplate  
E1.3R Communications   1416 Add 1 communication wallplate  
P1.3R     1416 5 kW heat exchanger  
E1.3R Communications   1450 Core: close cabletray loop at north end  
E1.3R Communications   1450 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
A2.1A Demolition 9 1509 Not necessary to demolish snorkel arm  
A2.1R     1509 Why remove the snorkel exhasut arm?  
E1.3R     1509 120 volt emergency power  
M1.3R     1509 Move exhaust to accommodate shelving  
M1.3R     1509 Vac pump exhaust  
M-2 HVAC Schedule   1509 Occupant check HVAC Schedule  
A2.1A Demolition 9 1517 Not necessary to demolish snorkel arm  
A2.1R     1517 Why remove the snorkel exhasut arm?  
A3.1A Renovation 7 1517 two cylinder racks  
E1.3R     1517 208 Emergency power  
M1.3R     1517 rotate fume hood  
M1.3R     1517 Vac pump exhaust  
M-2 HVAC Schedule   1517 Occupant check HVAC Schedule  
P1.3R     1517 Emergency shower piping at ceiling .  
E1.5R Communications   1640 Verify location of 1 communication wallplate  
E2.1R Communications   2020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E2.1R Communications   2020 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes.  
E2.2R Communications   2020 Core: close cabletray loop at east end, have CT crossover at bridge  
M2.1R     2207 Vac exhaust  
P2.1R     2207 Replace existing sink  
E2.1R     2217 110 emergency power in lab  
E2.2R     2217 One more 110 emergency power  
E2.2R Communications   2217 Add 1 communication wallplate  
M2.1R     2217 6' Fume hood chem and solvent storage  
M2.1R     2217 2 Vac exhaust  
P2.2R     2217 Add sink  
E2.2R     2223 110 emergency power in lab  
E2.2R     2225 110 emergency power in lab  
P2.2R     2332 Bring DI water to location of sink  
P2.2R     2334 Bring DI water to location of sink  
E2.3R     2402 Emergency power in core  
M-2 HVAC Schedule   2402 Occupant check HVAC Schedule  
P2.3R     2402 DI water in two locations  
P2.3R     2402 Nitrogen  
P2.3R     2402 Vac pump  
A3.2     2406 Need waste storage cabinet  
E2.3R     2406 Emergency power in core  
M-2 HVAC Schedule   2406 Occupant check HVAC Schedule  
P2.3R     2406 DI water in two locations  
P2.3R     2406 Nitrogen  
P2.3R     2406 Vac pump  
P2.3R     2406 2 Fume hoods  
A2.2     2410 2 each fume hoods removed and replaced with laminar bio cab for 2410 reno. Project  
A3.2     2410 Will be remodeled for Fygenson in Spring of 98  
E2.3R Communications   2410 Move 1 wallplate location  
M-2 HVAC Schedule   2410 Occupant check HVAC Schedule  
P1.1R     2410 See Feygenson remodel  
A3.2     2416 Will be remodeled for Fygenson in Spring of 98  
E2.3R Communications   2416 Move 3 wallplate locations  
E2.3R Communications   2419 Move 1 wallplate location  
E2.3R     2420 Emergency power  
E2.3R     2420 Emergency power in core  
P2.3R     2420 Note nitrogen location  
P2.3R     2420 Vac pump in core  
E2.3R Communications   2450 Core: close cabletray loop at north end  
E2.3R Communications   2450 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E2.3R Communications   2450 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes.  
M-2 HVAC Schedule   2509 Occupant check HVAC Schedule  
P2.3R     2509 3 compressed air  
P2.3R     2509 3 nitrogen  
P2.3R     2509 vacuum exhaust  
P2.3R     2509 120 volt emergency power in core  
A3.2     2513 Door added to 2517  
A3.2     2517 Door added to 2513  
E2.3R     2517 208 3phaase 20A emergency  
E2.3R     2517 110 V emergency power  
M-2 HVAC Schedule   2517 Occupant check HVAC Schedule  
M2.3R     2517 2 1 1/2" OD Vac pump exhaust  
M2.3R     2517 Heat exchanger in the lab  
M2.3R     2517 Pump in core  
M2.3R     2517 5 ' Laminar Flow Fume Hood, flammable chem storage  
M2.3R     2517 Heat exchanger in the core, 3kW aircooled unit  
P2.3R     2517 New nitrogen plumbing  
P2.3R     2517 DI water plumbed into sink with separate tap  
E3.1R Communications   3000 Add 1 communication wallplate  
E3.1R Communications   3001 Add 1 communication wallplate  
E3.1R Communications   3020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E3.2R Communications   3020 Core: close cabletray loop at east end, have CT crossover at bridge  
A2.3     3207 Note door location  
E3.1R     3207 Note door location  
P3.1R     3207 Note existing location of door  
A3.3     3209 Move fume hood to 3209A  
P3.1R     3209 Note location of exhaust hood  
P3.2R     3209 No fume hood indicated  
P3.2R     3214 Bring DI into noted location  
A2.3     3217 Note sink location  
A2.3     3217 Note fume hood location  
A3.3     3217 Hood location  
A3.3     3217 Door, Rich Harding  
M-2 HVAC Schedule   3217 Occupant check HVAC Schedule  
P3.2D     3217 Relocate sink  
P3.2R     3217 DI water to existing sink  
P3.2R     3217 Note location of fume hood  
P3.1D     3301 Actual room number is 3310  
P3.1R     3301 Actual room number is 3310  
P3.1R     3302 Note location of sink for DI water  
A2.3     3310 Labeled as 3301  
E3.0D     3310 See comment about notation 3B should be 2??  
E3.2R     3340 2 Emergency power outlets  
E3.2R     3340 4 communications ports  
      3340 3 Communications plates not 4.  
M-2 HVAC Schedule   3406 Occupant check HVAC Schedule  
M3.3R     3406 3 >>5  
M3.3R     3406 No air return?  
E3.3R     3409 Add data port  
P3.3R     3409 Note correct room number  
A3.3     3410 Gas cylinder rack  
M-2 HVAC Schedule   3410 Occupant check HVAC Schedule  
M3.3R     3410 Air return different from 3513,3509??  
E3.3R     3413 Add data port  
E3.3R     3416 Add data port  
E3.3R Communications   3416 Add 4 120V emergency power duplex receptacles  
E3.1R Communications   3450 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E3.3R Communications   3450 Core: close cabletray loop at north end  
E3.3R     3509 6 120V emergency power  
E3.3R     3509 3 220V emergency power  
E3.3R Communications   3509 Add 1 communication wallplate  
M-2 HVAC Schedule   3509 Occupant check HVAC Schedule  
M3.3R     3509 60 kW heat exchanger in core  
M-2 HVAC Schedule   3513 Occupant check HVAC Schedule  
P3.3R     3513 Note room number  
P3.3R     3513 60 kW heat exchanger in core  
M3.3R     3517 See fume hood location  
P3.3R     3517 Not correct location of hood FH8  
P3.3R     3517 DI water to hood  
E4.1R Communications   4020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E4.1R Communications   4020 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes.  
E4.2R Communications   4020 Core: close cabletray loop at east end, have CT crossover at bridge  
E4.1R Communications   4103 Add 2 communication wallplates  
M4.1R     4103 Provide separate controls and ducts, existing ducts inadequate  
E4.1R Communications   4105 Add 1 communication wallplate  
M4.1R     4105 Provide separate controls and ducts, existing ducts inadequate  
E4.1R Communications   4111 Add 1 communication wallplate  
E4.1R     4113 2 Data panels 1' above floor  
E4.1R Communications   4113 Add 1 communication wallplate  
E4.1R     4123 Add data port  
E4.1R     4123 2 communications ports  
E4.1R     4123 Data panel  
E4.1R Communications   4123 Add 1 communication wallplate  
      4123 There should be two complete communcation ports / plates in this office. This will necessitate two telephone lines.  
E4.1R     4207 Emergency power  
M-2 HVAC Schedule   4207 Occupant check HVAC Schedule  
M4.1R     4207 Exhaust  
M4.1R     4207 Heat exchanger in core  
P4.1R     4207 Add sink  
E4.2R     4217 110 emergency  
M4.2R     4217 +/- 1/2 F  
M4.2R     4217 Vac exhaust  
E4.2R     4223 110 emergency  
M4.2R     4223 +/- 1/2 F  
E4.2R     4225 110 emergency  
M4.2R     4225 +/- 1/2 F  
M4.2R     4225 heat exchanger in core  
E4.2R     4233 110 emergency  
M4.2R     4233 +/- 1/2 F  
E4.2R     4239 110 emergency  
M4.2R     4239 +/- 1/2 F  
M-2 HVAC Schedule   4308 Occupant check HVAC Schedule  
A3.4     4316 Replace curtain with swinging door  
A3.4     4318 Fume hood needed  
A3.4     4318 Increase opening  
E4.2R     4318 120 volt emergency power in core  
E4.2R     4318 120V emergency power  
M-2 HVAC Schedule   4318 Occupant check HVAC Schedule  
M4.2R     4318 cooling for diff pump  
M4.2R     4318 dry box in center of room  
P4.2R     4318 New fume hood w/sink  
P4.2R     4318 DI water  
P4.2R     4318 Nitrogen  
A3.4     4324 Increase opening  
E4.2R     4324 2 120V emergency power  
M-2 HVAC Schedule   4324 Occupant check HVAC Schedule  
M4.2R     4324 Pressure regulator on DI water / 20 psi  
P4.2R     4324 DI pressure regulator 10-50 PSIG  
P4.2R     4324 DI water plumbed into existing sink  
      4324 Second exit not required  
E4.2R     4326 2 120V emergency power  
M-2 HVAC Schedule   4326 Occupant check HVAC Schedule  
M4.2R     4326 Move heat exchangers from 4334 to 4326  
M4.2R     4326 Heat exchanger  
E4.2R     4332 2 120V emergency power  
Page #   Generic Room # Comments Lab occupant alert
0 0 0 0 Cooling water pipies not shown  
0 0 0 0 Vac pump exhaust detail is not settled.  
0 0 0 0 There are no special temperature and humidity documented. The whole building appears to be controlled at +/- 1 F  
0 0 0 0 Occupant's should view cheap heat exchangers and decide where they are acceptable.  
A2.1A Demolition 16 1000 Not necessary to demolish paving  
P1.1R     1014 Completed as part of PSR ADA. Not necessary  
E1.1R Communications   1015 Add 2 communication wallplates  
E1.1R Communications   1017 Add 1 communication wallplate  
E1.1R Communications   1019 Add 1 communication wallplate  
E1.1R Communications   1020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E1.2R Communications   1020 Core: close cabletray loop at east end, have CT crossover at bridge  
M1.1R     1207 +/- 1/2F  
E1.1R     1209 Emer 208 3 phase 20 A in core with switch in Lab  
E1.1R     1209 208 3 phase emergency power in lab  
M1.1R     1209 Heat exchanger in core  
M1.1R     1209 +/- 1/2F  
P1.2R     1215 vacuun exhaust  
M-2 HVAC Schedule   1217 Occupant check HVAC Schedule  
P1.2R     1217 2 vacuum exhaust  
E1.2R     1219 1 208, 3 phase emergency power 20 A  
E1.2R     1219 3 110 Emergency power  
E1.2R Communications   1219 Add 1 communication wallplate  
M1.1D     1219 2 Vac exhausts  
E1.2R     1251 3 emergency power outlets 208, 3 phase, 30 A  
E1.2R     1251 Outlets on far wall  
E1.2R     1251 Door not shown  
P1.2R Remodel 13 1251 New nitogen line  
P1.2R     1251 2 nitrogen  
P1.2R     1251 2 compressed air  
E1.3R Communications   1301 Add 2 communication wallplates  
A3.1A     1302 2 Two cylinder racks  
A3.1A     1302 Need chemical/solvent storage  
E1.1R     1302 Emergency power 208 3phase 60A  
E1.1R     1302 Emergency power 208 3phase 30A  
E1.1R     1302 Emergency power in core  
M1.1R     1302 Heat exchangers are not indicated for equipment.  
P1.1R     1302 Heat exchanger  
P1.1R     1302 Magnet cooling water 15kW, 3 gpm  
P1.1R     1302 New Sink  
E1.1R     1310 Add 2 emergengy power as indicated and remove one as indicated  
E1.1R     1310 Add one more 208 3 phase 20 A emergency in core  
M1.1R     1310 2 Vac pump exhaust in lab and 2 in core  
M1.1R     1310 Move heat exchangers into the core  
M-2 HVAC Lab Utility   1310 Add 2 1 1/2" diameter vacuum pump exhaust outlet in Lab Add 2 1 1/2" diameter vacuum pump exhaust in core provide plumbing to heat exchangers 2 in core  
M-2 HVAC Schedule   1310 Occupant check HVAC Schedule  
M-2 HVAC Schedule   1310 Occupant check HVAC Schedule  
E1.3R Communications   1311 Add 2 communication wallplates  
M-2 HVAC Schedule   1324 Occupant check HVAC Schedule  
P1.2R     1324 2 vacuum exhaust  
P1.2R     1324 3 nitrogen  
E1.2R     1332 110 emergency power in lab  
E1.2R     1332 208 3 phase 20 A emergency in core switched in the lab  
M1.2R     1332 Pump in core cooling water?  
M1.2R     1332 Heat exchanger in core  
M1.2R     1332 +/- 1/2 F  
P1.2R     1332 Sink stays  
P1.2R     1332 2 Nitrogen lines  
E1.2R     1356 3 110 emergency power  
M1.1D     1356 2 Vac exhausts  
M1.2R     1356 Fume hood and chem and solvent storage  
P1.2R     1356 Replace sink  
M1.4R     1362 Replace AC-3  
M-2 HVAC Schedule   1362 Occupant check HVAC Schedule  
E1.4R     1366 Add two more emergency power  
M1.4R     1366 Vac pump exhaust  
M-2 HVAC Schedule   1366 Occupant check HVAC Schedule  
E1.4R     1380 Add two emergency power  
M1.2D     1380 Cooling chiller CH-1, Pump P-1 removed??  
M1.4R     1380 2 20 kW heat exchangers  
M1.4R     1380 4 Vac pump exhaust  
M-2 HVAC Schedule   1380 Occupant check HVAC Schedule  
P1.4R     1380 Locate fume hood in 1326B  
P1.4R     1380 Add 3 nitrogen outlets  
E1.4R     1390 Add emergency power  
M-2 HVAC Schedule   1390 Occupant check HVAC Schedule  
E1.3R Communications   1409 Add 1 communication wallplate  
E1.3R Communications   1411 Add 1 communication wallplate  
E1.3R     1412 2 Communications ports  
M-2 HVAC Schedule   1412 Occupant check HVAC Schedule  
P1.3R     1412 2 vacuum exhaust  
P1.3R     1412 3 nitrogen  
P1.3R     1412 2 120 emergency power in core  
P1.3R     1412 1 208 emergency in core  
E1.3R Communications   1413 Add 1 communication wallplate  
E1.3R Communications   1415 Add 1 communication wallplate  
E1.3R Communications   1416 Add 1 communication wallplate  
P1.3R     1416 5 kW heat exchanger  
E1.3R Communications   1450 Core: close cabletray loop at north end  
E1.3R Communications   1450 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
A2.1A Demolition 9 1509 Not necessary to demolish snorkel arm  
A2.1R     1509 Why remove the snorkel exhasut arm?  
E1.3R     1509 120 volt emergency power  
M1.3R     1509 Move exhaust to accommodate shelving  
M1.3R     1509 Vac pump exhaust  
M-2 HVAC Schedule   1509 Occupant check HVAC Schedule  
A2.1A Demolition 9 1517 Not necessary to demolish snorkel arm  
A2.1R     1517 Why remove the snorkel exhasut arm?  
A3.1A Renovation 7 1517 two cylinder racks  
E1.3R     1517 208 Emergency power  
M1.3R     1517 rotate fume hood  
M1.3R     1517 Vac pump exhaust  
M-2 HVAC Schedule   1517 Occupant check HVAC Schedule  
P1.3R     1517 Emergency shower piping at ceiling .  
E1.5R Communications   1640 Verify location of 1 communication wallplate  
E2.1R Communications   2020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E2.1R Communications   2020 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes.  
E2.2R Communications   2020 Core: close cabletray loop at east end, have CT crossover at bridge  
M2.1R     2207 Vac exhaust  
P2.1R     2207 Replace existing sink  
E2.1R     2217 110 emergency power in lab  
E2.2R     2217 One more 110 emergency power  
E2.2R Communications   2217 Add 1 communication wallplate  
M2.1R     2217 6' Fume hood chem and solvent storage  
M2.1R     2217 2 Vac exhaust  
P2.2R     2217 Add sink  
E2.2R     2223 110 emergency power in lab  
E2.2R     2225 110 emergency power in lab  
P2.2R     2332 Bring DI water to location of sink  
P2.2R     2334 Bring DI water to location of sink  
E2.3R     2402 Emergency power in core  
M-2 HVAC Schedule   2402 Occupant check HVAC Schedule  
P2.3R     2402 DI water in two locations  
P2.3R     2402 Nitrogen  
P2.3R     2402 Vac pump  
A3.2     2406 Need waste storage cabinet  
E2.3R     2406 Emergency power in core  
M-2 HVAC Schedule   2406 Occupant check HVAC Schedule  
P2.3R     2406 DI water in two locations  
P2.3R     2406 Nitrogen  
P2.3R     2406 Vac pump  
P2.3R     2406 2 Fume hoods  
A2.2     2410 2 each fume hoods removed and replaced with laminar bio cab for 2410 reno. Project  
A3.2     2410 Will be remodeled for Fygenson in Spring of 98  
E2.3R Communications   2410 Move 1 wallplate location  
M-2 HVAC Schedule   2410 Occupant check HVAC Schedule  
P1.1R     2410 See Feygenson remodel  
A3.2     2416 Will be remodeled for Fygenson in Spring of 98  
E2.3R Communications   2416 Move 3 wallplate locations  
E2.3R Communications   2419 Move 1 wallplate location  
E2.3R     2420 Emergency power  
E2.3R     2420 Emergency power in core  
P2.3R     2420 Note nitrogen location  
P2.3R     2420 Vac pump in core  
E2.3R Communications   2450 Core: close cabletray loop at north end  
E2.3R Communications   2450 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E2.3R Communications   2450 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes.  
M-2 HVAC Schedule   2509 Occupant check HVAC Schedule  
P2.3R     2509 3 compressed air  
P2.3R     2509 3 nitrogen  
P2.3R     2509 vacuum exhaust  
P2.3R     2509 120 volt emergency power in core  
A3.2     2513 Door added to 2517  
A3.2     2517 Door added to 2513  
E2.3R     2517 208 3phaase 20A emergency  
E2.3R     2517 110 V emergency power  
M-2 HVAC Schedule   2517 Occupant check HVAC Schedule  
M2.3R     2517 2 1 1/2" OD Vac pump exhaust  
M2.3R     2517 Heat exchanger in the lab  
M2.3R     2517 Pump in core  
M2.3R     2517 5 ' Laminar Flow Fume Hood, flammable chem storage  
M2.3R     2517 Heat exchanger in the core, 3kW aircooled unit  
P2.3R     2517 New nitrogen plumbing  
P2.3R     2517 DI water plumbed into sink with separate tap  
E3.1R Communications   3000 Add 1 communication wallplate  
E3.1R Communications   3001 Add 1 communication wallplate  
E3.1R Communications   3020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E3.2R Communications   3020 Core: close cabletray loop at east end, have CT crossover at bridge  
A2.3     3207 Note door location  
E3.1R     3207 Note door location  
P3.1R     3207 Note existing location of door  
A3.3     3209 Move fume hood to 3209A  
P3.1R     3209 Note location of exhaust hood  
P3.2R     3209 No fume hood indicated  
P3.2R     3214 Bring DI into noted location  
A2.3     3217 Note sink location  
A2.3     3217 Note fume hood location  
A3.3     3217 Hood location  
A3.3     3217 Door, Rich Harding  
M-2 HVAC Schedule   3217 Occupant check HVAC Schedule  
P3.2D     3217 Relocate sink  
P3.2R     3217 DI water to existing sink  
P3.2R     3217 Note location of fume hood  
P3.1D     3301 Actual room number is 3310  
P3.1R     3301 Actual room number is 3310  
P3.1R     3302 Note location of sink for DI water  
A2.3     3310 Labeled as 3301  
E3.0D     3310 See comment about notation 3B should be 2??  
E3.2R     3340 2 Emergency power outlets  
E3.2R     3340 4 communications ports  
      3340 3 Communications plates not 4.  
M-2 HVAC Schedule   3406 Occupant check HVAC Schedule  
M3.3R     3406 3 >>5  
M3.3R     3406 No air return?  
E3.3R     3409 Add data port  
P3.3R     3409 Note correct room number  
A3.3     3410 Gas cylinder rack  
M-2 HVAC Schedule   3410 Occupant check HVAC Schedule  
M3.3R     3410 Air return different from 3513,3509??  
E3.3R     3413 Add data port  
E3.3R     3416 Add data port  
E3.3R Communications   3416 Add 4 120V emergency power duplex receptacles  
E3.1R Communications   3450 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E3.3R Communications   3450 Core: close cabletray loop at north end  
E3.3R     3509 6 120V emergency power  
E3.3R     3509 3 220V emergency power  
E3.3R Communications   3509 Add 1 communication wallplate  
M-2 HVAC Schedule   3509 Occupant check HVAC Schedule  
M3.3R     3509 60 kW heat exchanger in core  
M-2 HVAC Schedule   3513 Occupant check HVAC Schedule  
P3.3R     3513 Note room number  
P3.3R     3513 60 kW heat exchanger in core  
M3.3R     3517 See fume hood location  
P3.3R     3517 Not correct location of hood FH8  
P3.3R     3517 DI water to hood  
E4.1R Communications   4020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E4.1R Communications   4020 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes.  
E4.2R Communications   4020 Core: close cabletray loop at east end, have CT crossover at bridge  
E4.1R Communications   4103 Add 2 communication wallplates  
M4.1R     4103 Provide separate controls and ducts, existing ducts inadequate  
E4.1R Communications   4105 Add 1 communication wallplate  
M4.1R     4105 Provide separate controls and ducts, existing ducts inadequate  
E4.1R Communications   4111 Add 1 communication wallplate  
E4.1R     4113 2 Data panels 1' above floor  
E4.1R Communications   4113 Add 1 communication wallplate  
E4.1R     4123 Add data port  
E4.1R     4123 2 communications ports  
E4.1R     4123 Data panel  
E4.1R Communications   4123 Add 1 communication wallplate  
      4123 There should be two complete communcation ports / plates in this office. This will necessitate two telephone lines.  
E4.1R     4207 Emergency power  
M-2 HVAC Schedule   4207 Occupant check HVAC Schedule  
M4.1R     4207 Exhaust  
M4.1R     4207 Heat exchanger in core  
P4.1R     4207 Add sink  
E4.2R     4217 110 emergency  
M4.2R     4217 +/- 1/2 F  
M4.2R     4217 Vac exhaust  
E4.2R     4223 110 emergency  
M4.2R     4223 +/- 1/2 F  
E4.2R     4225 110 emergency  
M4.2R     4225 +/- 1/2 F  
M4.2R     4225 heat exchanger in core  
E4.2R     4233 110 emergency  
M4.2R     4233 +/- 1/2 F  
E4.2R     4239 110 emergency  
M4.2R     4239 +/- 1/2 F  
M-2 HVAC Schedule   4308 Occupant check HVAC Schedule  
A3.4     4316 Replace curtain with swinging door  
A3.4     4318 Fume hood needed  
A3.4     4318 Increase opening  
E4.2R     4318 120 volt emergency power in core  
E4.2R     4318 120V emergency power  
M-2 HVAC Schedule   4318 Occupant check HVAC Schedule  
M4.2R     4318 cooling for diff pump  
M4.2R     4318 dry box in center of room  
P4.2R     4318 New fume hood w/sink  
P4.2R     4318 DI water  
P4.2R     4318 Nitrogen  
A3.4     4324 Increase opening  
E4.2R     4324 2 120V emergency power  
M-2 HVAC Schedule   4324 Occupant check HVAC Schedule  
M4.2R     4324 Pressure regulator on DI water / 20 psi  
P4.2R     4324 DI pressure regulator 10-50 PSIG  
P4.2R     4324 DI water plumbed into existing sink  
      4324 Second exit not required  
E4.2R     4326 2 120V emergency power  
M-2 HVAC Schedule   4326 Occupant check HVAC Schedule  
M4.2R     4326 Move heat exchangers from 4334 to 4326  
M4.2R     4326 Heat exchanger  
E4.2R     4332 2 120V emergency power  
E4.2R Communications   4332 Add 1 communication wallplate  
P4.2R     4332 Nitrogen  
M-2 HVAC Schedule   4333 Occupant check HVAC Schedule  
E4.2R     4334 2 120V emergency power  
M-2 HVAC Schedule   4334 Occupant check HVAC Schedule  
E4.2R     4340 2 120V emergency power  
M-2 HVAC Schedule   4340 Occupant check HVAC Schedule  
M4.2R     4340 Move heat exchangers from 4332 to 4340  
M4.2R     4340 See heat exchanger location  
P4.2R     4340 DI water plumbed into existing sink  
A3.4     4402 New sink  
A3.4     4402 Gas cylinder rack  
E4.3R     4402 emergency power in core  
E4.3R     4402 Emergency power  
M4.3R     4402 Heat exchanger  
P4.3R     4402 Nitrogen  
P4.3R     4402 DI to sink  
A3.4     4406 New sink  
E4.3R     4406 emergency power in core  
E4.3R     4406 2 emergency power outlets  
P4.3R     4406 Remove equipment cooling plumbing  
E4.3R     4409 Emergency power  
A3.4     4410 Gas cylinder rack  
E4.3R     4410 Emergency power  
E4.3R     4410 emergency power in core  
M4.3R     4410 Heat exchanger  
P4.3R     4410 Nitrogen  
E4.3R     4411 Emergency power  
E4.3R     4412 Emergency power  
P4.3R     4412 Remove equipment cooling plumbing  
E4.3R     4415 Emergency power  
A3.4     4418 +/- 1F  
E4.3R     4418 2 Emergency power outlets  
E4.3R     4418 2 pumps in core  
E4.3R     4418 2 Emergency power outlets in the core  
M4.3R     4418 cooling for 2 diff pump  
P4.3R     4418 Nitrogen  
E4.3R     4419 Emergency power  
E4.1R Communications   4450 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E4.1R Communications   4450 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes.  
E4.3R Communications   4450 Core: close cabletray loop at north end  
E4.3R     4509 emergency power in core  
M4.3R     4509 Heat exchanger  
P4.3R     4509 Nitrogen  
A3.4     4513 Replace sink and case work with solvent storage  
A3.4     4513 4 Gas cylinder racks  
A3.4     4513 Remove toic gas cabinet  
A3.4     4513 Door added  
E4.3R     4513 emergency power in core  
M-2 HVAC Schedule   4513 Occupant check HVAC Schedule  
M4.3R     4513 Existing gas cabinet  
M4.3R     4513 Gas cabinet for hazardous gas IPOS  
M4.3R     4513 Diff pump  
M4.3R     4513 Existing compresseed gas cabinet  
P4.3R     4513 Nitrogen  
P4.3R     4513 DI water to sink as noted  
A3.4     4517 Remove sink  
A3.4     4517 solvent storage  
E4.3R     4517 emergency power in core  
M4.3R     4517 Heat exchanger for magnet, diff pumps and laser  
P4.3R     4517 Nitrogen  
E5.1R Communications   5020 Move 5th floor main communications terminal from 5217 to Core  
E5.1R Communications   5020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E5.2R Communications   5020 Core: close cabletray loop at east end, have CT crossover at bridge  
E5.1R Communications   5124 Add 1 communication wallplate  
E5.1R Communications   5131 Add 1 communication wallplate  
E5.2R Communications   5215 Add 1 communication wallplate  
E5.2R Communications   5217 Replace 5th floor main communications terminal (now in core) w/subterminal  
E5.2R Communications   5217 Add 1 120V emergency power duplex receptacles  
E5.2R Communications   5223 Add 1 subterminal  
A3.5     5334 Snorkel exhaust arm not required  
E6.1R Communications   6020 Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
E6.2R Communications   6020 Core: close cabletray loop at east end, have CT crossover at bridge  
E6.1R Communications   6105 Move location of 1 communication wallplate  
E6.1R Communications   6123 Add 1 communication wallplate  
E6.1R Communications   6204 Add 1 communication wallplate  
E6.2R Communications   6212 Add 1 communication wallplate  
A3.6 Renovation 13 6302 April 98 remodel  
A3.6 Renovation 13 6308 April 98 remodel  
A3.6 Renovation 13 6310 April 98 remodel  
A3.6 Renovation 13 6316 April 98 remodel  
A3.6 Renovation 13 6318 April 98 remodel  
A2.6 Demolition 4 6324 This will be done as part of Hansma renovation  
A3.6 Renovation 13 6324 April 98 remodel  
M-2 HVAC Schedule   6324 Occupant check HVAC Schedule  
A3.6 Renovation 13 6332 April 98 remodel  
M7.2R     7389 Room in stairwell should be suitable for storage and access.  
M7.2R     7389 Storage area at top of stairs has a hazardous step into space  
E0.1R Communications   0018 Add cabletray from Main terminal room to North core small terminal room  
E1.1R Communications   1017A Add 1 communication wallplate  
M-2 HVAC Schedule   1215A Occupant check HVAC Schedule  
M1.2R     1251A Cooling water in here  
M1.2R     1251A Air inlet but there is no air outlet???  
P1.2R     1322A DI water  
P1.2R     1322A Compressed Air  
P1.2R     1322B Nitrogen  
E1.4R     1362A Add one more emergency power  
E1.4R Communications   1362A Add 2 120V emergency power duplex receptacles for telecommunications terminal.  
M1.4R     1362B Fume hood with chem storage  
P1.4R     1362B DI water in sink  
P1.4R     1362B FH/11 8' located here with chem and solvent storage  
M1.4R     1390A Vac pump exhaust  
M1.4R     1390A 60 kW heat exchanger  
M-2 HVAC Schedule   1390A Occupant check HVAC Schedule  
P2.1R     2310A Bring DI water to location of sink  
E3.1R Communications   3019A Add 1 communication wallplate  
A3.3     3209A Note existing door  
P3.1R     3209A Note exhaust hood  
P3.1R     3209A Bring DI water to location of sink  
P3.1D     3301A Actual room number is 3310A  
P3.1R     3301A Actual room number is 3310A  
A2.3     3310A Labeled as 3301A  
E3.0D     3310A Note breaker panel  
P3.1R     3310A DI water comes to sink  
P4.2R     4215A Sink stays  
P4.2R     4215A DI water add  
E0.3R Communications   Core Add cabletray from Main terminal room to North core small terminal room  
P1.2R     Core Nitrogen  
P4.1R     Core Nitrogen  
P4.2R     Core Nitrogen  
A3.1E     L100 Sound proof doors  
E1.5D     L100 centralize all electrical panels  
E1.5D     L100 Repair/replace all bad lamp sockets  
E1.5R     L100 Data projector connectors  
E1.5R     L100 Suspend data projector from ceiling as well as required electrical and communications  
M1.3D     L100 Thermostats removed to 1630 to make student proof Missing sheets
P1.5R     L107 Add hot water  
P1.5R     L107 Add DI water  
M1.3D     L108 Thermostats removed to 1630 to make student proof Missing sheets
A3.1E     L110 Sound proof doors  
M1.3D     L110 Thermostats removed to 1630 to make student proof Missing sheets
A3.1E     L201 Repair ladder  
A3.1E     L201 Sound proof doors  
E7.1R Communications   Roof Add 6 communication wallplates  
E7.2R Communications   Roof Add 3 communication wallplates  
A1.1   2   Emergency generator should be relocated to area behind nitrogen storage  
A3.2 Renovation 6   See Fygenson remodel spring 98  
A3.2 Renovation 14   See Fygenson remodel spring 98  
A3.2 Renovation 15   See Fygenson remodel spring 98  
A3.2 Renovation 17   See Fygenson remodel spring 98  
A3.3       How do we upgrade the wall wrt to fire rating  
A3.7 Renovation     Exhaust should re-examined See new location for emergency generator  
A4.1       Revisit intake noise issues  
A5.7       Expand the pad as shown on plans to protect roof from astro students.  
A5.7       Move emergency generator exhaust to clear space for astro students.  
A5.7       Celestron mounting fixtures must remain on roof.  
A5.7       Increase pad size to protect roof from Astro students  
A5.7       Make sure exhaust stakes do not present a hazard to Astro students  
E0.01 Demolition 1   No walls removed, not all existing to be removed.  
E0.01 Demolition 1   No walls are to be removed  
E0.01 Demolition 1   Not all existing to be removed  
E0.01 General 5   Physics department will specify conditions underwhich the contractor will work.  
E0.01 General 5   We need clearly specify "conditions"  
E0.01 General 11   We need to be supplied with a set of current "as built" drawings at the completion of the project  
E0.01 Demolition 12   Existing conductors in the labs will be reused.  
E0.01 Demolition 12   All new wiring is not necessary….  
E0.01 General 14   No disruption of labs not being renovated.  
E0.01 General 14   Clarification required for HVAC work  
E0.01 General 20   Lab equipment that is hardwired needs to be identified by occupants to get it rehardwired. Likewise odd plugs and receptacles that need to be reproduced by contractor need to be called out. X
E0.01 General 20   Lab equipment will be reconnected by occupant or contractor as occupant sees fit.  
E0.01 General 23   No flexible conduit in labs  
E0.01 General 44   Flush mounting is not required. With few exceptions surface mounting is acceptable.  
E0.01 General 44   Surface mount is acceptable  
E0.01 General 47   We did not agree on separate ground in lab raceway  
E0.01 General 47   Where are the grounds being installed? Early agreement was new grounds from breakers to main panel. No new grounds in lab.  
E0.01 General 49   Leave existing panel boards in labs. What do these specs dictate vis-à-vis demolition.  
E0.01 General 49   Leave existing power oanels  
E0.01 General 50   Replacing receptacles is not cost effective. Broken receptacles should be replaced as maintenance.  
E0.01 General 51   Do not replace all switches.  
E0.01 General 53   Grounding conductors in core but not from breaker panels to outlets in labs.  
E0.01 General 53   Except in labs  
E0.01 General 54   This is applicable to the core only.  
E0.01 General 60   Check electrical noise levels  
E0.01 General 61   Do not replace what is not required . Recent energy bond project  
E0.01 General 49,50,51   Do not replace unless broken or missing  
E0.03 Remodel 4   RELOCATE Emergency Generator  
M0.0D Demolition 18   Remove acoustic duct liner. What level of acoustic noise in new air handling system?  
M1.1D Demolition 6   Remove acoustic duct liner. What level of acoustic noise in new air handling system?  
M1.1R       Need cooling water  
M1.2D Demolition 2   Remove acoustic duct liner. What level of acoustic noise in new air handling system?  
M1.2D       Remove (E) AC-3  
M1.3D Demolition 8   Remove acoustic duct liner. What level of acoustic noise in new air handling system? Missing sheets
M1.3D       Work in lecture halls must take place in summer time Missing sheets
M1.3R       item 15 should be labeld as 14?  
M2.3R       Need cooling water for stills  
M3.2R       11 New fresh air intake. How do we accommodate Lubin's hoist?  
M6.0D       Missing 5th floor demo plan  
M6.2R       Pleased to note : For labs requiring humidity control, electric humidifiers shall be…. What does this mean?  
M7.2R       Exhaust towers should be located and terminated so as to provide no hazard to astro-students on roof.  
M7.2R       Expand the pad as shown on plans to protect roof from astro students.  
M7.2R       Move emergency generator exhaust to clear space for astro students.  
M7.2R       Celestron mounting fixtures must remain on roof.  
M7.2R       Increase pad size to protect roof from Astro students  
M7.2R       Make sure exhaust stakes do not present a hazard to Astro students  
P0.2D Demolition 1   Vacuum pump need not go?  
P0.2D       Sprinkler note core wall and front wall!!  
P0.2R Spinkler Note     All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL and FRONT WALL SPRINKLERS  
P0.3D Demolition 1   Remove existing vacuum pump?? Necessary??  
P0.3R Spinkler Note     All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL OR FRONT WALL SPRINKLERS  
P-1 Lab Equipment Schedule FH 5   Add DI water  
P-1       FH/5 is a Laminar Flow Fume hood 5' long  
P1.1R General 2   Lavatories on first floor were recently redone  
P1.1R General 3   Lavatories on first floor were recently redone  
P1.1R General 4   Lavatories on first floor were recently redone  
P1.1R General 6   Lavatories on first floor were recently redone  
P1.3R          
S3.1   2   Emergency generator  
           