| Page # | Generic | Room # | Comments | Lab occupant alert | |
| 0 | 0 | 0 | 0 | Cooling water pipies not shown | |
| 0 | 0 | 0 | 0 | Vac pump exhaust detail is not settled. | |
| 0 | 0 | 0 | 0 | There are no special temperature and humidity documented. The whole building appears to be controlled at +/- 1 F | |
| 0 | 0 | 0 | 0 | Occupant's should view cheap heat exchangers and decide where they are acceptable. | |
| A2.1A | Demolition | 16 | 1000 | Not necessary to demolish paving | |
| P1.1R | 1014 | Completed as part of PSR ADA. Not necessary | |||
| E1.1R | Communications | 1015 | Add 2 communication wallplates | ||
| E1.1R | Communications | 1017 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1019 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.2R | Communications | 1020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| M1.1R | 1207 | +/- 1/2F | |||
| E1.1R | 1209 | Emer 208 3 phase 20 A in core with switch in Lab | |||
| E1.1R | 1209 | 208 3 phase emergency power in lab | |||
| M1.1R | 1209 | Heat exchanger in core | |||
| M1.1R | 1209 | +/- 1/2F | |||
| P1.2R | 1215 | vacuun exhaust | |||
| M-2 | HVAC Schedule | 1217 | Occupant check HVAC Schedule | ||
| P1.2R | 1217 | 2 vacuum exhaust | |||
| E1.2R | 1219 | 1 208, 3 phase emergency power 20 A | |||
| E1.2R | 1219 | 3 110 Emergency power | |||
| E1.2R | Communications | 1219 | Add 1 communication wallplate | ||
| M1.1D | 1219 | 2 Vac exhausts | |||
| E1.2R | 1251 | 3 emergency power outlets 208, 3 phase, 30 A | |||
| E1.2R | 1251 | Outlets on far wall | |||
| E1.2R | 1251 | Door not shown | |||
| P1.2R | Remodel | 13 | 1251 | New nitogen line | |
| P1.2R | 1251 | 2 nitrogen | |||
| P1.2R | 1251 | 2 compressed air | |||
| E1.3R | Communications | 1301 | Add 2 communication wallplates | ||
| A3.1A | 1302 | 2 Two cylinder racks | |||
| A3.1A | 1302 | Need chemical/solvent storage | |||
| E1.1R | 1302 | Emergency power 208 3phase 60A | |||
| E1.1R | 1302 | Emergency power 208 3phase 30A | |||
| E1.1R | 1302 | Emergency power in core | |||
| M1.1R | 1302 | Heat exchangers are not indicated for equipment. | |||
| P1.1R | 1302 | Heat exchanger | |||
| P1.1R | 1302 | Magnet cooling water 15kW, 3 gpm | |||
| P1.1R | 1302 | New Sink | |||
| E1.1R | 1310 | Add 2 emergengy power as indicated and remove one as indicated | |||
| E1.1R | 1310 | Add one more 208 3 phase 20 A emergency in core | |||
| M1.1R | 1310 | 2 Vac pump exhaust in lab and 2 in core | |||
| M1.1R | 1310 | Move heat exchangers into the core | |||
| M-2 | HVAC Lab Utility | 1310 | Add 2 1 1/2" diameter vacuum pump exhaust outlet in Lab Add 2 1 1/2" diameter vacuum pump exhaust in core provide plumbing to heat exchangers 2 in core | ||
| M-2 | HVAC Schedule | 1310 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1310 | Occupant check HVAC Schedule | ||
| E1.3R | Communications | 1311 | Add 2 communication wallplates | ||
| M-2 | HVAC Schedule | 1324 | Occupant check HVAC Schedule | ||
| P1.2R | 1324 | 2 vacuum exhaust | |||
| P1.2R | 1324 | 3 nitrogen | |||
| E1.2R | 1332 | 110 emergency power in lab | |||
| E1.2R | 1332 | 208 3 phase 20 A emergency in core switched in the lab | |||
| M1.2R | 1332 | Pump in core cooling water? | |||
| M1.2R | 1332 | Heat exchanger in core | |||
| M1.2R | 1332 | +/- 1/2 F | |||
| P1.2R | 1332 | Sink stays | |||
| P1.2R | 1332 | 2 Nitrogen lines | |||
| E1.2R | 1356 | 3 110 emergency power | |||
| M1.1D | 1356 | 2 Vac exhausts | |||
| M1.2R | 1356 | Fume hood and chem and solvent storage | |||
| P1.2R | 1356 | Replace sink | |||
| M1.4R | 1362 | Replace AC-3 | |||
| M-2 | HVAC Schedule | 1362 | Occupant check HVAC Schedule | ||
| E1.4R | 1366 | Add two more emergency power | |||
| M1.4R | 1366 | Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1366 | Occupant check HVAC Schedule | ||
| E1.4R | 1380 | Add two emergency power | |||
| M1.2D | 1380 | Cooling chiller CH-1, Pump P-1 removed?? | |||
| M1.4R | 1380 | 2 20 kW heat exchangers | |||
| M1.4R | 1380 | 4 Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1380 | Occupant check HVAC Schedule | ||
| P1.4R | 1380 | Locate fume hood in 1326B | |||
| P1.4R | 1380 | Add 3 nitrogen outlets | |||
| E1.4R | 1390 | Add emergency power | |||
| M-2 | HVAC Schedule | 1390 | Occupant check HVAC Schedule | ||
| E1.3R | Communications | 1409 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1411 | Add 1 communication wallplate | ||
| E1.3R | 1412 | 2 Communications ports | |||
| M-2 | HVAC Schedule | 1412 | Occupant check HVAC Schedule | ||
| P1.3R | 1412 | 2 vacuum exhaust | |||
| P1.3R | 1412 | 3 nitrogen | |||
| P1.3R | 1412 | 2 120 emergency power in core | |||
| P1.3R | 1412 | 1 208 emergency in core | |||
| E1.3R | Communications | 1413 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1415 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1416 | Add 1 communication wallplate | ||
| P1.3R | 1416 | 5 kW heat exchanger | |||
| E1.3R | Communications | 1450 | Core: close cabletray loop at north end | ||
| E1.3R | Communications | 1450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| A2.1A | Demolition | 9 | 1509 | Not necessary to demolish snorkel arm | |
| A2.1R | 1509 | Why remove the snorkel exhasut arm? | |||
| E1.3R | 1509 | 120 volt emergency power | |||
| M1.3R | 1509 | Move exhaust to accommodate shelving | |||
| M1.3R | 1509 | Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1509 | Occupant check HVAC Schedule | ||
| A2.1A | Demolition | 9 | 1517 | Not necessary to demolish snorkel arm | |
| A2.1R | 1517 | Why remove the snorkel exhasut arm? | |||
| A3.1A | Renovation | 7 | 1517 | two cylinder racks | |
| E1.3R | 1517 | 208 Emergency power | |||
| M1.3R | 1517 | rotate fume hood | |||
| M1.3R | 1517 | Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1517 | Occupant check HVAC Schedule | ||
| P1.3R | 1517 | Emergency shower piping at ceiling . | |||
| E1.5R | Communications | 1640 | Verify location of 1 communication wallplate | ||
| E2.1R | Communications | 2020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.1R | Communications | 2020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E2.2R | Communications | 2020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| M2.1R | 2207 | Vac exhaust | |||
| P2.1R | 2207 | Replace existing sink | |||
| E2.1R | 2217 | 110 emergency power in lab | |||
| E2.2R | 2217 | One more 110 emergency power | |||
| E2.2R | Communications | 2217 | Add 1 communication wallplate | ||
| M2.1R | 2217 | 6' Fume hood chem and solvent storage | |||
| M2.1R | 2217 | 2 Vac exhaust | |||
| P2.2R | 2217 | Add sink | |||
| E2.2R | 2223 | 110 emergency power in lab | |||
| E2.2R | 2225 | 110 emergency power in lab | |||
| P2.2R | 2332 | Bring DI water to location of sink | |||
| P2.2R | 2334 | Bring DI water to location of sink | |||
| E2.3R | 2402 | Emergency power in core | |||
| M-2 | HVAC Schedule | 2402 | Occupant check HVAC Schedule | ||
| P2.3R | 2402 | DI water in two locations | |||
| P2.3R | 2402 | Nitrogen | |||
| P2.3R | 2402 | Vac pump | |||
| A3.2 | 2406 | Need waste storage cabinet | |||
| E2.3R | 2406 | Emergency power in core | |||
| M-2 | HVAC Schedule | 2406 | Occupant check HVAC Schedule | ||
| P2.3R | 2406 | DI water in two locations | |||
| P2.3R | 2406 | Nitrogen | |||
| P2.3R | 2406 | Vac pump | |||
| P2.3R | 2406 | 2 Fume hoods | |||
| A2.2 | 2410 | 2 each fume hoods removed and replaced with laminar bio cab for 2410 reno. Project | |||
| A3.2 | 2410 | Will be remodeled for Fygenson in Spring of 98 | |||
| E2.3R | Communications | 2410 | Move 1 wallplate location | ||
| M-2 | HVAC Schedule | 2410 | Occupant check HVAC Schedule | ||
| P1.1R | 2410 | See Feygenson remodel | |||
| A3.2 | 2416 | Will be remodeled for Fygenson in Spring of 98 | |||
| E2.3R | Communications | 2416 | Move 3 wallplate locations | ||
| E2.3R | Communications | 2419 | Move 1 wallplate location | ||
| E2.3R | 2420 | Emergency power | |||
| E2.3R | 2420 | Emergency power in core | |||
| P2.3R | 2420 | Note nitrogen location | |||
| P2.3R | 2420 | Vac pump in core | |||
| E2.3R | Communications | 2450 | Core: close cabletray loop at north end | ||
| E2.3R | Communications | 2450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.3R | Communications | 2450 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| M-2 | HVAC Schedule | 2509 | Occupant check HVAC Schedule | ||
| P2.3R | 2509 | 3 compressed air | |||
| P2.3R | 2509 | 3 nitrogen | |||
| P2.3R | 2509 | vacuum exhaust | |||
| P2.3R | 2509 | 120 volt emergency power in core | |||
| A3.2 | 2513 | Door added to 2517 | |||
| A3.2 | 2517 | Door added to 2513 | |||
| E2.3R | 2517 | 208 3phaase 20A emergency | |||
| E2.3R | 2517 | 110 V emergency power | |||
| M-2 | HVAC Schedule | 2517 | Occupant check HVAC Schedule | ||
| M2.3R | 2517 | 2 1 1/2" OD Vac pump exhaust | |||
| M2.3R | 2517 | Heat exchanger in the lab | |||
| M2.3R | 2517 | Pump in core | |||
| M2.3R | 2517 | 5 ' Laminar Flow Fume Hood, flammable chem storage | |||
| M2.3R | 2517 | Heat exchanger in the core, 3kW aircooled unit | |||
| P2.3R | 2517 | New nitrogen plumbing | |||
| P2.3R | 2517 | DI water plumbed into sink with separate tap | |||
| E3.1R | Communications | 3000 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3001 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.2R | Communications | 3020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| A2.3 | 3207 | Note door location | |||
| E3.1R | 3207 | Note door location | |||
| P3.1R | 3207 | Note existing location of door | |||
| A3.3 | 3209 | Move fume hood to 3209A | |||
| P3.1R | 3209 | Note location of exhaust hood | |||
| P3.2R | 3209 | No fume hood indicated | |||
| P3.2R | 3214 | Bring DI into noted location | |||
| A2.3 | 3217 | Note sink location | |||
| A2.3 | 3217 | Note fume hood location | |||
| A3.3 | 3217 | Hood location | |||
| A3.3 | 3217 | Door, Rich Harding | |||
| M-2 | HVAC Schedule | 3217 | Occupant check HVAC Schedule | ||
| P3.2D | 3217 | Relocate sink | |||
| P3.2R | 3217 | DI water to existing sink | |||
| P3.2R | 3217 | Note location of fume hood | |||
| P3.1D | 3301 | Actual room number is 3310 | |||
| P3.1R | 3301 | Actual room number is 3310 | |||
| P3.1R | 3302 | Note location of sink for DI water | |||
| A2.3 | 3310 | Labeled as 3301 | |||
| E3.0D | 3310 | See comment about notation 3B should be 2?? | |||
| E3.2R | 3340 | 2 Emergency power outlets | |||
| E3.2R | 3340 | 4 communications ports | |||
| 3340 | 3 Communications plates not 4. | ||||
| M-2 | HVAC Schedule | 3406 | Occupant check HVAC Schedule | ||
| M3.3R | 3406 | 3 >>5 | |||
| M3.3R | 3406 | No air return? | |||
| E3.3R | 3409 | Add data port | |||
| P3.3R | 3409 | Note correct room number | |||
| A3.3 | 3410 | Gas cylinder rack | |||
| M-2 | HVAC Schedule | 3410 | Occupant check HVAC Schedule | ||
| M3.3R | 3410 | Air return different from 3513,3509?? | |||
| E3.3R | 3413 | Add data port | |||
| E3.3R | 3416 | Add data port | |||
| E3.3R | Communications | 3416 | Add 4 120V emergency power duplex receptacles | ||
| E3.1R | Communications | 3450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.3R | Communications | 3450 | Core: close cabletray loop at north end | ||
| E3.3R | 3509 | 6 120V emergency power | |||
| E3.3R | 3509 | 3 220V emergency power | |||
| E3.3R | Communications | 3509 | Add 1 communication wallplate | ||
| M-2 | HVAC Schedule | 3509 | Occupant check HVAC Schedule | ||
| M3.3R | 3509 | 60 kW heat exchanger in core | |||
| M-2 | HVAC Schedule | 3513 | Occupant check HVAC Schedule | ||
| P3.3R | 3513 | Note room number | |||
| P3.3R | 3513 | 60 kW heat exchanger in core | |||
| M3.3R | 3517 | See fume hood location | |||
| P3.3R | 3517 | Not correct location of hood FH8 | |||
| P3.3R | 3517 | DI water to hood | |||
| E4.1R | Communications | 4020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E4.1R | Communications | 4020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E4.2R | Communications | 4020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E4.1R | Communications | 4103 | Add 2 communication wallplates | ||
| M4.1R | 4103 | Provide separate controls and ducts, existing ducts inadequate | |||
| E4.1R | Communications | 4105 | Add 1 communication wallplate | ||
| M4.1R | 4105 | Provide separate controls and ducts, existing ducts inadequate | |||
| E4.1R | Communications | 4111 | Add 1 communication wallplate | ||
| E4.1R | 4113 | 2 Data panels 1' above floor | |||
| E4.1R | Communications | 4113 | Add 1 communication wallplate | ||
| E4.1R | 4123 | Add data port | |||
| E4.1R | 4123 | 2 communications ports | |||
| E4.1R | 4123 | Data panel | |||
| E4.1R | Communications | 4123 | Add 1 communication wallplate | ||
| 4123 | There should be two complete communcation ports / plates in this office. This will necessitate two telephone lines. | ||||
| E4.1R | 4207 | Emergency power | |||
| M-2 | HVAC Schedule | 4207 | Occupant check HVAC Schedule | ||
| M4.1R | 4207 | Exhaust | |||
| M4.1R | 4207 | Heat exchanger in core | |||
| P4.1R | 4207 | Add sink | |||
| E4.2R | 4217 | 110 emergency | |||
| M4.2R | 4217 | +/- 1/2 F | |||
| M4.2R | 4217 | Vac exhaust | |||
| E4.2R | 4223 | 110 emergency | |||
| M4.2R | 4223 | +/- 1/2 F | |||
| E4.2R | 4225 | 110 emergency | |||
| M4.2R | 4225 | +/- 1/2 F | |||
| M4.2R | 4225 | heat exchanger in core | |||
| E4.2R | 4233 | 110 emergency | |||
| M4.2R | 4233 | +/- 1/2 F | |||
| E4.2R | 4239 | 110 emergency | |||
| M4.2R | 4239 | +/- 1/2 F | |||
| M-2 | HVAC Schedule | 4308 | Occupant check HVAC Schedule | ||
| A3.4 | 4316 | Replace curtain with swinging door | |||
| A3.4 | 4318 | Fume hood needed | |||
| A3.4 | 4318 | Increase opening | |||
| E4.2R | 4318 | 120 volt emergency power in core | |||
| E4.2R | 4318 | 120V emergency power | |||
| M-2 | HVAC Schedule | 4318 | Occupant check HVAC Schedule | ||
| M4.2R | 4318 | cooling for diff pump | |||
| M4.2R | 4318 | dry box in center of room | |||
| P4.2R | 4318 | New fume hood w/sink | |||
| P4.2R | 4318 | DI water | |||
| P4.2R | 4318 | Nitrogen | |||
| A3.4 | 4324 | Increase opening | |||
| E4.2R | 4324 | 2 120V emergency power | |||
| M-2 | HVAC Schedule | 4324 | Occupant check HVAC Schedule | ||
| M4.2R | 4324 | Pressure regulator on DI water / 20 psi | |||
| P4.2R | 4324 | DI pressure regulator 10-50 PSIG | |||
| P4.2R | 4324 | DI water plumbed into existing sink | |||
| 4324 | Second exit not required | ||||
| E4.2R | 4326 | 2 120V emergency power | |||
| M-2 | HVAC Schedule | 4326 | Occupant check HVAC Schedule | ||
| M4.2R | 4326 | Move heat exchangers from 4334 to 4326 | |||
| M4.2R | 4326 | Heat exchanger | |||
| E4.2R | 4332 | 2 120V emergency power |
| Page # | Generic | Room # | Comments | Lab occupant alert | |
| 0 | 0 | 0 | 0 | Cooling water pipies not shown | |
| 0 | 0 | 0 | 0 | Vac pump exhaust detail is not settled. | |
| 0 | 0 | 0 | 0 | There are no special temperature and humidity documented. The whole building appears to be controlled at +/- 1 F | |
| 0 | 0 | 0 | 0 | Occupant's should view cheap heat exchangers and decide where they are acceptable. | |
| A2.1A | Demolition | 16 | 1000 | Not necessary to demolish paving | |
| P1.1R | 1014 | Completed as part of PSR ADA. Not necessary | |||
| E1.1R | Communications | 1015 | Add 2 communication wallplates | ||
| E1.1R | Communications | 1017 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1019 | Add 1 communication wallplate | ||
| E1.1R | Communications | 1020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E1.2R | Communications | 1020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| M1.1R | 1207 | +/- 1/2F | |||
| E1.1R | 1209 | Emer 208 3 phase 20 A in core with switch in Lab | |||
| E1.1R | 1209 | 208 3 phase emergency power in lab | |||
| M1.1R | 1209 | Heat exchanger in core | |||
| M1.1R | 1209 | +/- 1/2F | |||
| P1.2R | 1215 | vacuun exhaust | |||
| M-2 | HVAC Schedule | 1217 | Occupant check HVAC Schedule | ||
| P1.2R | 1217 | 2 vacuum exhaust | |||
| E1.2R | 1219 | 1 208, 3 phase emergency power 20 A | |||
| E1.2R | 1219 | 3 110 Emergency power | |||
| E1.2R | Communications | 1219 | Add 1 communication wallplate | ||
| M1.1D | 1219 | 2 Vac exhausts | |||
| E1.2R | 1251 | 3 emergency power outlets 208, 3 phase, 30 A | |||
| E1.2R | 1251 | Outlets on far wall | |||
| E1.2R | 1251 | Door not shown | |||
| P1.2R | Remodel | 13 | 1251 | New nitogen line | |
| P1.2R | 1251 | 2 nitrogen | |||
| P1.2R | 1251 | 2 compressed air | |||
| E1.3R | Communications | 1301 | Add 2 communication wallplates | ||
| A3.1A | 1302 | 2 Two cylinder racks | |||
| A3.1A | 1302 | Need chemical/solvent storage | |||
| E1.1R | 1302 | Emergency power 208 3phase 60A | |||
| E1.1R | 1302 | Emergency power 208 3phase 30A | |||
| E1.1R | 1302 | Emergency power in core | |||
| M1.1R | 1302 | Heat exchangers are not indicated for equipment. | |||
| P1.1R | 1302 | Heat exchanger | |||
| P1.1R | 1302 | Magnet cooling water 15kW, 3 gpm | |||
| P1.1R | 1302 | New Sink | |||
| E1.1R | 1310 | Add 2 emergengy power as indicated and remove one as indicated | |||
| E1.1R | 1310 | Add one more 208 3 phase 20 A emergency in core | |||
| M1.1R | 1310 | 2 Vac pump exhaust in lab and 2 in core | |||
| M1.1R | 1310 | Move heat exchangers into the core | |||
| M-2 | HVAC Lab Utility | 1310 | Add 2 1 1/2" diameter vacuum pump exhaust outlet in Lab Add 2 1 1/2" diameter vacuum pump exhaust in core provide plumbing to heat exchangers 2 in core | ||
| M-2 | HVAC Schedule | 1310 | Occupant check HVAC Schedule | ||
| M-2 | HVAC Schedule | 1310 | Occupant check HVAC Schedule | ||
| E1.3R | Communications | 1311 | Add 2 communication wallplates | ||
| M-2 | HVAC Schedule | 1324 | Occupant check HVAC Schedule | ||
| P1.2R | 1324 | 2 vacuum exhaust | |||
| P1.2R | 1324 | 3 nitrogen | |||
| E1.2R | 1332 | 110 emergency power in lab | |||
| E1.2R | 1332 | 208 3 phase 20 A emergency in core switched in the lab | |||
| M1.2R | 1332 | Pump in core cooling water? | |||
| M1.2R | 1332 | Heat exchanger in core | |||
| M1.2R | 1332 | +/- 1/2 F | |||
| P1.2R | 1332 | Sink stays | |||
| P1.2R | 1332 | 2 Nitrogen lines | |||
| E1.2R | 1356 | 3 110 emergency power | |||
| M1.1D | 1356 | 2 Vac exhausts | |||
| M1.2R | 1356 | Fume hood and chem and solvent storage | |||
| P1.2R | 1356 | Replace sink | |||
| M1.4R | 1362 | Replace AC-3 | |||
| M-2 | HVAC Schedule | 1362 | Occupant check HVAC Schedule | ||
| E1.4R | 1366 | Add two more emergency power | |||
| M1.4R | 1366 | Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1366 | Occupant check HVAC Schedule | ||
| E1.4R | 1380 | Add two emergency power | |||
| M1.2D | 1380 | Cooling chiller CH-1, Pump P-1 removed?? | |||
| M1.4R | 1380 | 2 20 kW heat exchangers | |||
| M1.4R | 1380 | 4 Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1380 | Occupant check HVAC Schedule | ||
| P1.4R | 1380 | Locate fume hood in 1326B | |||
| P1.4R | 1380 | Add 3 nitrogen outlets | |||
| E1.4R | 1390 | Add emergency power | |||
| M-2 | HVAC Schedule | 1390 | Occupant check HVAC Schedule | ||
| E1.3R | Communications | 1409 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1411 | Add 1 communication wallplate | ||
| E1.3R | 1412 | 2 Communications ports | |||
| M-2 | HVAC Schedule | 1412 | Occupant check HVAC Schedule | ||
| P1.3R | 1412 | 2 vacuum exhaust | |||
| P1.3R | 1412 | 3 nitrogen | |||
| P1.3R | 1412 | 2 120 emergency power in core | |||
| P1.3R | 1412 | 1 208 emergency in core | |||
| E1.3R | Communications | 1413 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1415 | Add 1 communication wallplate | ||
| E1.3R | Communications | 1416 | Add 1 communication wallplate | ||
| P1.3R | 1416 | 5 kW heat exchanger | |||
| E1.3R | Communications | 1450 | Core: close cabletray loop at north end | ||
| E1.3R | Communications | 1450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| A2.1A | Demolition | 9 | 1509 | Not necessary to demolish snorkel arm | |
| A2.1R | 1509 | Why remove the snorkel exhasut arm? | |||
| E1.3R | 1509 | 120 volt emergency power | |||
| M1.3R | 1509 | Move exhaust to accommodate shelving | |||
| M1.3R | 1509 | Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1509 | Occupant check HVAC Schedule | ||
| A2.1A | Demolition | 9 | 1517 | Not necessary to demolish snorkel arm | |
| A2.1R | 1517 | Why remove the snorkel exhasut arm? | |||
| A3.1A | Renovation | 7 | 1517 | two cylinder racks | |
| E1.3R | 1517 | 208 Emergency power | |||
| M1.3R | 1517 | rotate fume hood | |||
| M1.3R | 1517 | Vac pump exhaust | |||
| M-2 | HVAC Schedule | 1517 | Occupant check HVAC Schedule | ||
| P1.3R | 1517 | Emergency shower piping at ceiling . | |||
| E1.5R | Communications | 1640 | Verify location of 1 communication wallplate | ||
| E2.1R | Communications | 2020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.1R | Communications | 2020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E2.2R | Communications | 2020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| M2.1R | 2207 | Vac exhaust | |||
| P2.1R | 2207 | Replace existing sink | |||
| E2.1R | 2217 | 110 emergency power in lab | |||
| E2.2R | 2217 | One more 110 emergency power | |||
| E2.2R | Communications | 2217 | Add 1 communication wallplate | ||
| M2.1R | 2217 | 6' Fume hood chem and solvent storage | |||
| M2.1R | 2217 | 2 Vac exhaust | |||
| P2.2R | 2217 | Add sink | |||
| E2.2R | 2223 | 110 emergency power in lab | |||
| E2.2R | 2225 | 110 emergency power in lab | |||
| P2.2R | 2332 | Bring DI water to location of sink | |||
| P2.2R | 2334 | Bring DI water to location of sink | |||
| E2.3R | 2402 | Emergency power in core | |||
| M-2 | HVAC Schedule | 2402 | Occupant check HVAC Schedule | ||
| P2.3R | 2402 | DI water in two locations | |||
| P2.3R | 2402 | Nitrogen | |||
| P2.3R | 2402 | Vac pump | |||
| A3.2 | 2406 | Need waste storage cabinet | |||
| E2.3R | 2406 | Emergency power in core | |||
| M-2 | HVAC Schedule | 2406 | Occupant check HVAC Schedule | ||
| P2.3R | 2406 | DI water in two locations | |||
| P2.3R | 2406 | Nitrogen | |||
| P2.3R | 2406 | Vac pump | |||
| P2.3R | 2406 | 2 Fume hoods | |||
| A2.2 | 2410 | 2 each fume hoods removed and replaced with laminar bio cab for 2410 reno. Project | |||
| A3.2 | 2410 | Will be remodeled for Fygenson in Spring of 98 | |||
| E2.3R | Communications | 2410 | Move 1 wallplate location | ||
| M-2 | HVAC Schedule | 2410 | Occupant check HVAC Schedule | ||
| P1.1R | 2410 | See Feygenson remodel | |||
| A3.2 | 2416 | Will be remodeled for Fygenson in Spring of 98 | |||
| E2.3R | Communications | 2416 | Move 3 wallplate locations | ||
| E2.3R | Communications | 2419 | Move 1 wallplate location | ||
| E2.3R | 2420 | Emergency power | |||
| E2.3R | 2420 | Emergency power in core | |||
| P2.3R | 2420 | Note nitrogen location | |||
| P2.3R | 2420 | Vac pump in core | |||
| E2.3R | Communications | 2450 | Core: close cabletray loop at north end | ||
| E2.3R | Communications | 2450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E2.3R | Communications | 2450 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| M-2 | HVAC Schedule | 2509 | Occupant check HVAC Schedule | ||
| P2.3R | 2509 | 3 compressed air | |||
| P2.3R | 2509 | 3 nitrogen | |||
| P2.3R | 2509 | vacuum exhaust | |||
| P2.3R | 2509 | 120 volt emergency power in core | |||
| A3.2 | 2513 | Door added to 2517 | |||
| A3.2 | 2517 | Door added to 2513 | |||
| E2.3R | 2517 | 208 3phaase 20A emergency | |||
| E2.3R | 2517 | 110 V emergency power | |||
| M-2 | HVAC Schedule | 2517 | Occupant check HVAC Schedule | ||
| M2.3R | 2517 | 2 1 1/2" OD Vac pump exhaust | |||
| M2.3R | 2517 | Heat exchanger in the lab | |||
| M2.3R | 2517 | Pump in core | |||
| M2.3R | 2517 | 5 ' Laminar Flow Fume Hood, flammable chem storage | |||
| M2.3R | 2517 | Heat exchanger in the core, 3kW aircooled unit | |||
| P2.3R | 2517 | New nitrogen plumbing | |||
| P2.3R | 2517 | DI water plumbed into sink with separate tap | |||
| E3.1R | Communications | 3000 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3001 | Add 1 communication wallplate | ||
| E3.1R | Communications | 3020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.2R | Communications | 3020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| A2.3 | 3207 | Note door location | |||
| E3.1R | 3207 | Note door location | |||
| P3.1R | 3207 | Note existing location of door | |||
| A3.3 | 3209 | Move fume hood to 3209A | |||
| P3.1R | 3209 | Note location of exhaust hood | |||
| P3.2R | 3209 | No fume hood indicated | |||
| P3.2R | 3214 | Bring DI into noted location | |||
| A2.3 | 3217 | Note sink location | |||
| A2.3 | 3217 | Note fume hood location | |||
| A3.3 | 3217 | Hood location | |||
| A3.3 | 3217 | Door, Rich Harding | |||
| M-2 | HVAC Schedule | 3217 | Occupant check HVAC Schedule | ||
| P3.2D | 3217 | Relocate sink | |||
| P3.2R | 3217 | DI water to existing sink | |||
| P3.2R | 3217 | Note location of fume hood | |||
| P3.1D | 3301 | Actual room number is 3310 | |||
| P3.1R | 3301 | Actual room number is 3310 | |||
| P3.1R | 3302 | Note location of sink for DI water | |||
| A2.3 | 3310 | Labeled as 3301 | |||
| E3.0D | 3310 | See comment about notation 3B should be 2?? | |||
| E3.2R | 3340 | 2 Emergency power outlets | |||
| E3.2R | 3340 | 4 communications ports | |||
| 3340 | 3 Communications plates not 4. | ||||
| M-2 | HVAC Schedule | 3406 | Occupant check HVAC Schedule | ||
| M3.3R | 3406 | 3 >>5 | |||
| M3.3R | 3406 | No air return? | |||
| E3.3R | 3409 | Add data port | |||
| P3.3R | 3409 | Note correct room number | |||
| A3.3 | 3410 | Gas cylinder rack | |||
| M-2 | HVAC Schedule | 3410 | Occupant check HVAC Schedule | ||
| M3.3R | 3410 | Air return different from 3513,3509?? | |||
| E3.3R | 3413 | Add data port | |||
| E3.3R | 3416 | Add data port | |||
| E3.3R | Communications | 3416 | Add 4 120V emergency power duplex receptacles | ||
| E3.1R | Communications | 3450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E3.3R | Communications | 3450 | Core: close cabletray loop at north end | ||
| E3.3R | 3509 | 6 120V emergency power | |||
| E3.3R | 3509 | 3 220V emergency power | |||
| E3.3R | Communications | 3509 | Add 1 communication wallplate | ||
| M-2 | HVAC Schedule | 3509 | Occupant check HVAC Schedule | ||
| M3.3R | 3509 | 60 kW heat exchanger in core | |||
| M-2 | HVAC Schedule | 3513 | Occupant check HVAC Schedule | ||
| P3.3R | 3513 | Note room number | |||
| P3.3R | 3513 | 60 kW heat exchanger in core | |||
| M3.3R | 3517 | See fume hood location | |||
| P3.3R | 3517 | Not correct location of hood FH8 | |||
| P3.3R | 3517 | DI water to hood | |||
| E4.1R | Communications | 4020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E4.1R | Communications | 4020 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E4.2R | Communications | 4020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E4.1R | Communications | 4103 | Add 2 communication wallplates | ||
| M4.1R | 4103 | Provide separate controls and ducts, existing ducts inadequate | |||
| E4.1R | Communications | 4105 | Add 1 communication wallplate | ||
| M4.1R | 4105 | Provide separate controls and ducts, existing ducts inadequate | |||
| E4.1R | Communications | 4111 | Add 1 communication wallplate | ||
| E4.1R | 4113 | 2 Data panels 1' above floor | |||
| E4.1R | Communications | 4113 | Add 1 communication wallplate | ||
| E4.1R | 4123 | Add data port | |||
| E4.1R | 4123 | 2 communications ports | |||
| E4.1R | 4123 | Data panel | |||
| E4.1R | Communications | 4123 | Add 1 communication wallplate | ||
| 4123 | There should be two complete communcation ports / plates in this office. This will necessitate two telephone lines. | ||||
| E4.1R | 4207 | Emergency power | |||
| M-2 | HVAC Schedule | 4207 | Occupant check HVAC Schedule | ||
| M4.1R | 4207 | Exhaust | |||
| M4.1R | 4207 | Heat exchanger in core | |||
| P4.1R | 4207 | Add sink | |||
| E4.2R | 4217 | 110 emergency | |||
| M4.2R | 4217 | +/- 1/2 F | |||
| M4.2R | 4217 | Vac exhaust | |||
| E4.2R | 4223 | 110 emergency | |||
| M4.2R | 4223 | +/- 1/2 F | |||
| E4.2R | 4225 | 110 emergency | |||
| M4.2R | 4225 | +/- 1/2 F | |||
| M4.2R | 4225 | heat exchanger in core | |||
| E4.2R | 4233 | 110 emergency | |||
| M4.2R | 4233 | +/- 1/2 F | |||
| E4.2R | 4239 | 110 emergency | |||
| M4.2R | 4239 | +/- 1/2 F | |||
| M-2 | HVAC Schedule | 4308 | Occupant check HVAC Schedule | ||
| A3.4 | 4316 | Replace curtain with swinging door | |||
| A3.4 | 4318 | Fume hood needed | |||
| A3.4 | 4318 | Increase opening | |||
| E4.2R | 4318 | 120 volt emergency power in core | |||
| E4.2R | 4318 | 120V emergency power | |||
| M-2 | HVAC Schedule | 4318 | Occupant check HVAC Schedule | ||
| M4.2R | 4318 | cooling for diff pump | |||
| M4.2R | 4318 | dry box in center of room | |||
| P4.2R | 4318 | New fume hood w/sink | |||
| P4.2R | 4318 | DI water | |||
| P4.2R | 4318 | Nitrogen | |||
| A3.4 | 4324 | Increase opening | |||
| E4.2R | 4324 | 2 120V emergency power | |||
| M-2 | HVAC Schedule | 4324 | Occupant check HVAC Schedule | ||
| M4.2R | 4324 | Pressure regulator on DI water / 20 psi | |||
| P4.2R | 4324 | DI pressure regulator 10-50 PSIG | |||
| P4.2R | 4324 | DI water plumbed into existing sink | |||
| 4324 | Second exit not required | ||||
| E4.2R | 4326 | 2 120V emergency power | |||
| M-2 | HVAC Schedule | 4326 | Occupant check HVAC Schedule | ||
| M4.2R | 4326 | Move heat exchangers from 4334 to 4326 | |||
| M4.2R | 4326 | Heat exchanger | |||
| E4.2R | 4332 | 2 120V emergency power | |||
| E4.2R | Communications | 4332 | Add 1 communication wallplate | ||
| P4.2R | 4332 | Nitrogen | |||
| M-2 | HVAC Schedule | 4333 | Occupant check HVAC Schedule | ||
| E4.2R | 4334 | 2 120V emergency power | |||
| M-2 | HVAC Schedule | 4334 | Occupant check HVAC Schedule | ||
| E4.2R | 4340 | 2 120V emergency power | |||
| M-2 | HVAC Schedule | 4340 | Occupant check HVAC Schedule | ||
| M4.2R | 4340 | Move heat exchangers from 4332 to 4340 | |||
| M4.2R | 4340 | See heat exchanger location | |||
| P4.2R | 4340 | DI water plumbed into existing sink | |||
| A3.4 | 4402 | New sink | |||
| A3.4 | 4402 | Gas cylinder rack | |||
| E4.3R | 4402 | emergency power in core | |||
| E4.3R | 4402 | Emergency power | |||
| M4.3R | 4402 | Heat exchanger | |||
| P4.3R | 4402 | Nitrogen | |||
| P4.3R | 4402 | DI to sink | |||
| A3.4 | 4406 | New sink | |||
| E4.3R | 4406 | emergency power in core | |||
| E4.3R | 4406 | 2 emergency power outlets | |||
| P4.3R | 4406 | Remove equipment cooling plumbing | |||
| E4.3R | 4409 | Emergency power | |||
| A3.4 | 4410 | Gas cylinder rack | |||
| E4.3R | 4410 | Emergency power | |||
| E4.3R | 4410 | emergency power in core | |||
| M4.3R | 4410 | Heat exchanger | |||
| P4.3R | 4410 | Nitrogen | |||
| E4.3R | 4411 | Emergency power | |||
| E4.3R | 4412 | Emergency power | |||
| P4.3R | 4412 | Remove equipment cooling plumbing | |||
| E4.3R | 4415 | Emergency power | |||
| A3.4 | 4418 | +/- 1F | |||
| E4.3R | 4418 | 2 Emergency power outlets | |||
| E4.3R | 4418 | 2 pumps in core | |||
| E4.3R | 4418 | 2 Emergency power outlets in the core | |||
| M4.3R | 4418 | cooling for 2 diff pump | |||
| P4.3R | 4418 | Nitrogen | |||
| E4.3R | 4419 | Emergency power | |||
| E4.1R | Communications | 4450 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E4.1R | Communications | 4450 | 2x3" or 3x2" conduit connecting cores. No more than 270 degree turns with 24" sweeps. No LBs or junction boxes. | ||
| E4.3R | Communications | 4450 | Core: close cabletray loop at north end | ||
| E4.3R | 4509 | emergency power in core | |||
| M4.3R | 4509 | Heat exchanger | |||
| P4.3R | 4509 | Nitrogen | |||
| A3.4 | 4513 | Replace sink and case work with solvent storage | |||
| A3.4 | 4513 | 4 Gas cylinder racks | |||
| A3.4 | 4513 | Remove toic gas cabinet | |||
| A3.4 | 4513 | Door added | |||
| E4.3R | 4513 | emergency power in core | |||
| M-2 | HVAC Schedule | 4513 | Occupant check HVAC Schedule | ||
| M4.3R | 4513 | Existing gas cabinet | |||
| M4.3R | 4513 | Gas cabinet for hazardous gas IPOS | |||
| M4.3R | 4513 | Diff pump | |||
| M4.3R | 4513 | Existing compresseed gas cabinet | |||
| P4.3R | 4513 | Nitrogen | |||
| P4.3R | 4513 | DI water to sink as noted | |||
| A3.4 | 4517 | Remove sink | |||
| A3.4 | 4517 | solvent storage | |||
| E4.3R | 4517 | emergency power in core | |||
| M4.3R | 4517 | Heat exchanger for magnet, diff pumps and laser | |||
| P4.3R | 4517 | Nitrogen | |||
| E5.1R | Communications | 5020 | Move 5th floor main communications terminal from 5217 to Core | ||
| E5.1R | Communications | 5020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E5.2R | Communications | 5020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E5.1R | Communications | 5124 | Add 1 communication wallplate | ||
| E5.1R | Communications | 5131 | Add 1 communication wallplate | ||
| E5.2R | Communications | 5215 | Add 1 communication wallplate | ||
| E5.2R | Communications | 5217 | Replace 5th floor main communications terminal (now in core) w/subterminal | ||
| E5.2R | Communications | 5217 | Add 1 120V emergency power duplex receptacles | ||
| E5.2R | Communications | 5223 | Add 1 subterminal | ||
| A3.5 | 5334 | Snorkel exhaust arm not required | |||
| E6.1R | Communications | 6020 | Core: Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| E6.2R | Communications | 6020 | Core: close cabletray loop at east end, have CT crossover at bridge | ||
| E6.1R | Communications | 6105 | Move location of 1 communication wallplate | ||
| E6.1R | Communications | 6123 | Add 1 communication wallplate | ||
| E6.1R | Communications | 6204 | Add 1 communication wallplate | ||
| E6.2R | Communications | 6212 | Add 1 communication wallplate | ||
| A3.6 | Renovation | 13 | 6302 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6308 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6310 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6316 | April 98 remodel | |
| A3.6 | Renovation | 13 | 6318 | April 98 remodel | |
| A2.6 | Demolition | 4 | 6324 | This will be done as part of Hansma renovation | |
| A3.6 | Renovation | 13 | 6324 | April 98 remodel | |
| M-2 | HVAC Schedule | 6324 | Occupant check HVAC Schedule | ||
| A3.6 | Renovation | 13 | 6332 | April 98 remodel | |
| M7.2R | 7389 | Room in stairwell should be suitable for storage and access. | |||
| M7.2R | 7389 | Storage area at top of stairs has a hazardous step into space | |||
| E0.1R | Communications | 0018 | Add cabletray from Main terminal room to North core small terminal room | ||
| E1.1R | Communications | 1017A | Add 1 communication wallplate | ||
| M-2 | HVAC Schedule | 1215A | Occupant check HVAC Schedule | ||
| M1.2R | 1251A | Cooling water in here | |||
| M1.2R | 1251A | Air inlet but there is no air outlet??? | |||
| P1.2R | 1322A | DI water | |||
| P1.2R | 1322A | Compressed Air | |||
| P1.2R | 1322B | Nitrogen | |||
| E1.4R | 1362A | Add one more emergency power | |||
| E1.4R | Communications | 1362A | Add 2 120V emergency power duplex receptacles for telecommunications terminal. | ||
| M1.4R | 1362B | Fume hood with chem storage | |||
| P1.4R | 1362B | DI water in sink | |||
| P1.4R | 1362B | FH/11 8' located here with chem and solvent storage | |||
| M1.4R | 1390A | Vac pump exhaust | |||
| M1.4R | 1390A | 60 kW heat exchanger | |||
| M-2 | HVAC Schedule | 1390A | Occupant check HVAC Schedule | ||
| P2.1R | 2310A | Bring DI water to location of sink | |||
| E3.1R | Communications | 3019A | Add 1 communication wallplate | ||
| A3.3 | 3209A | Note existing door | |||
| P3.1R | 3209A | Note exhaust hood | |||
| P3.1R | 3209A | Bring DI water to location of sink | |||
| P3.1D | 3301A | Actual room number is 3310A | |||
| P3.1R | 3301A | Actual room number is 3310A | |||
| A2.3 | 3310A | Labeled as 3301A | |||
| E3.0D | 3310A | Note breaker panel | |||
| P3.1R | 3310A | DI water comes to sink | |||
| P4.2R | 4215A | Sink stays | |||
| P4.2R | 4215A | DI water add | |||
| E0.3R | Communications | Core | Add cabletray from Main terminal room to North core small terminal room | ||
| P1.2R | Core | Nitrogen | |||
| P4.1R | Core | Nitrogen | |||
| P4.2R | Core | Nitrogen | |||
| A3.1E | L100 | Sound proof doors | |||
| E1.5D | L100 | centralize all electrical panels | |||
| E1.5D | L100 | Repair/replace all bad lamp sockets | |||
| E1.5R | L100 | Data projector connectors | |||
| E1.5R | L100 | Suspend data projector from ceiling as well as required electrical and communications | |||
| M1.3D | L100 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| P1.5R | L107 | Add hot water | |||
| P1.5R | L107 | Add DI water | |||
| M1.3D | L108 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| A3.1E | L110 | Sound proof doors | |||
| M1.3D | L110 | Thermostats removed to 1630 to make student proof | Missing sheets | ||
| A3.1E | L201 | Repair ladder | |||
| A3.1E | L201 | Sound proof doors | |||
| E7.1R | Communications | Roof | Add 6 communication wallplates | ||
| E7.2R | Communications | Roof | Add 3 communication wallplates | ||
| A1.1 | 2 | Emergency generator should be relocated to area behind nitrogen storage | |||
| A3.2 | Renovation | 6 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 14 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 15 | See Fygenson remodel spring 98 | ||
| A3.2 | Renovation | 17 | See Fygenson remodel spring 98 | ||
| A3.3 | How do we upgrade the wall wrt to fire rating | ||||
| A3.7 | Renovation | Exhaust should re-examined See new location for emergency generator | |||
| A4.1 | Revisit intake noise issues | ||||
| A5.7 | Expand the pad as shown on plans to protect roof from astro students. | ||||
| A5.7 | Move emergency generator exhaust to clear space for astro students. | ||||
| A5.7 | Celestron mounting fixtures must remain on roof. | ||||
| A5.7 | Increase pad size to protect roof from Astro students | ||||
| A5.7 | Make sure exhaust stakes do not present a hazard to Astro students | ||||
| E0.01 | Demolition | 1 | No walls removed, not all existing to be removed. | ||
| E0.01 | Demolition | 1 | No walls are to be removed | ||
| E0.01 | Demolition | 1 | Not all existing to be removed | ||
| E0.01 | General | 5 | Physics department will specify conditions underwhich the contractor will work. | ||
| E0.01 | General | 5 | We need clearly specify "conditions" | ||
| E0.01 | General | 11 | We need to be supplied with a set of current "as built" drawings at the completion of the project | ||
| E0.01 | Demolition | 12 | Existing conductors in the labs will be reused. | ||
| E0.01 | Demolition | 12 | All new wiring is not necessary…. | ||
| E0.01 | General | 14 | No disruption of labs not being renovated. | ||
| E0.01 | General | 14 | Clarification required for HVAC work | ||
| E0.01 | General | 20 | Lab equipment that is hardwired needs to be identified by occupants to get it rehardwired. Likewise odd plugs and receptacles that need to be reproduced by contractor need to be called out. | X | |
| E0.01 | General | 20 | Lab equipment will be reconnected by occupant or contractor as occupant sees fit. | ||
| E0.01 | General | 23 | No flexible conduit in labs | ||
| E0.01 | General | 44 | Flush mounting is not required. With few exceptions surface mounting is acceptable. | ||
| E0.01 | General | 44 | Surface mount is acceptable | ||
| E0.01 | General | 47 | We did not agree on separate ground in lab raceway | ||
| E0.01 | General | 47 | Where are the grounds being installed? Early agreement was new grounds from breakers to main panel. No new grounds in lab. | ||
| E0.01 | General | 49 | Leave existing panel boards in labs. What do these specs dictate vis-à-vis demolition. | ||
| E0.01 | General | 49 | Leave existing power oanels | ||
| E0.01 | General | 50 | Replacing receptacles is not cost effective. Broken receptacles should be replaced as maintenance. | ||
| E0.01 | General | 51 | Do not replace all switches. | ||
| E0.01 | General | 53 | Grounding conductors in core but not from breaker panels to outlets in labs. | ||
| E0.01 | General | 53 | Except in labs | ||
| E0.01 | General | 54 | This is applicable to the core only. | ||
| E0.01 | General | 60 | Check electrical noise levels | ||
| E0.01 | General | 61 | Do not replace what is not required . Recent energy bond project | ||
| E0.01 | General | 49,50,51 | Do not replace unless broken or missing | ||
| E0.03 | Remodel | 4 | RELOCATE Emergency Generator | ||
| M0.0D | Demolition | 18 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1D | Demolition | 6 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.1R | Need cooling water | ||||
| M1.2D | Demolition | 2 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | ||
| M1.2D | Remove (E) AC-3 | ||||
| M1.3D | Demolition | 8 | Remove acoustic duct liner. What level of acoustic noise in new air handling system? | Missing sheets | |
| M1.3D | Work in lecture halls must take place in summer time | Missing sheets | |||
| M1.3R | item 15 should be labeld as 14? | ||||
| M2.3R | Need cooling water for stills | ||||
| M3.2R | 11 New fresh air intake. How do we accommodate Lubin's hoist? | ||||
| M6.0D | Missing 5th floor demo plan | ||||
| M6.2R | Pleased to note : For labs requiring humidity control, electric humidifiers shall be…. What does this mean? | ||||
| M7.2R | Exhaust towers should be located and terminated so as to provide no hazard to astro-students on roof. | ||||
| M7.2R | Expand the pad as shown on plans to protect roof from astro students. | ||||
| M7.2R | Move emergency generator exhaust to clear space for astro students. | ||||
| M7.2R | Celestron mounting fixtures must remain on roof. | ||||
| M7.2R | Increase pad size to protect roof from Astro students | ||||
| M7.2R | Make sure exhaust stakes do not present a hazard to Astro students | ||||
| P0.2D | Demolition | 1 | Vacuum pump need not go? | ||
| P0.2D | Sprinkler note core wall and front wall!! | ||||
| P0.2R | Spinkler Note | All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL and FRONT WALL SPRINKLERS | |||
| P0.3D | Demolition | 1 | Remove existing vacuum pump?? Necessary?? | ||
| P0.3R | Spinkler Note | All areas to be sprinkled including walkways. LABS TO HAVE CORE WALL OR FRONT WALL SPRINKLERS | |||
| P-1 | Lab Equipment Schedule | FH 5 | Add DI water | ||
| P-1 | FH/5 is a Laminar Flow Fume hood 5' long | ||||
| P1.1R | General | 2 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 3 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 4 | Lavatories on first floor were recently redone | ||
| P1.1R | General | 6 | Lavatories on first floor were recently redone | ||
| P1.3R | |||||
| S3.1 | 2 | Emergency generator | |||